Montague Water Conservation District- Dwinnell Enhancement

Salmonid Habitat Restoration and Acquisition

Instream Flow
Project ID725245
Recovery DomainsN CA - S Oregon
Start Date09/15/2017
End Date09/10/2020
Year2014
StatusCompleted
Last Edited01/25/2024
 
1 - 1

Description    


This project installed critical infrastructure for improving water quality and quantity to the Shasta River. The improvements provide operational flexibility in flow releases for water quality, and accuracy in water measurement. Instream enhancements for summer and winter rearing included development of a 6.5 cfs cold-water source, development of salmonid habitat features- back watered alcove, riffles, wood structures, spawning, riparian planting. Project monitoring from newly installed devises will record flow volumes and water temperatures to verify project commitments in annual report to State Water Resource Control Board.

Project Benefit    


This project allows for the creation of a cold water habitat, incorporation of a significant source of cold water to expand limited over summering habitat and increased Cross Canal capacity to allow increased releases to the Shasta River.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$767,907
Other$462,057
Report Total:$1,229,964


Project Map



Worksites

7211385    


  • Worksite Identifier: 7211385
  • Start Date:
  • End Date:
Area Description
Below Dwinnel Dam

Location Information

  • Basin: Klamath (180102)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: N CA - S Oregon
  • Latitude: 41.541878
  • Longitude: -122.374292

ESU

  • Upper Klamath / Trinity Rivers Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Klamath Mountains Province Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 1,243,692.00
    •      . . C.0.b Length of stream treated/protected .02
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Conservation Habitat Enhancement and Restoration Project (CHERP)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 1,243,692.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow .02
      •      . . . . C.3.c Change in water flow110 (cfs)
      •      . . . . C.3.d.1 Water flow gaugesY (Y/N)
        •      . . . . . . C.3.d.2 Number of water flow gauges 4