San Gregorio Creek Habitat Enhancement Project - Phase 2
Salmonid Habitat Restoration and Acquisition
|
724673 | N Central California Coast | 06/01/2016 | 05/08/2020 | 2015 | Completed | 01/25/2024 | |
| |
Description
Fourteen log structures constructed in 0.42 miles of San Gregorio Creek, similar overall to grant agreement. One extra log structure implemented downstream of Feature #1, making 15 total log structures constructed. Extra wood was gathered on site and use of large LWD and rootwads was primary. Use of on site redwood, and conifer LWD. Anchoring done by rebar to boulder, log to log, bracket to log/rock, and/or unachored LWD.
Project Benefit
LWD installation would increase water quality, fish passage, and spawning habitat while reducing sediment loads and riparian disfunction. Increase shelter and cover along reach for juveniles and adults. Increase pool frequency for rearing salmonids.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.42 |
.42 |
Funding Details |
PCSRF | $132,999 |
In-Kind Donated Labor | $38,438 |
In-Kind Other | $365 |
Report Total: | $171,802 |
|
| |
Worksites
7211079
- Worksite Identifier: 7211079
- Start Date:
- End Date:
Area Description
Stream Reach
Location Information
- Basin: San Francisco Bay (180500)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 37.3117
- Longitude: -122.312
ESU
- Central California Coast Coho Salmon ESU
- Central California Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 171,802.00
- . . C.0.b
Length of stream treated/protected .42
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 171,802.00
- . . . . C.4.b
Total length of instream habitat treated .42
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .42
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 6
- . . . . . . C.4.d.7
Number of structures placed in channel 15
|
|