Bear Creek Instream Habitat Enhancement Project

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID1611968183963
Recovery DomainsN Central California Coast
Start Date05/12/2021
End Date02/28/2023
Year2018
StatusOngoing
Last Edited11/05/2021
 
1 - 1

Description    


The specific objective of this Project is to accelerate fisheries recovery by installing 189 key logs, distributed in 50 unique feature locations, specifically identified and 100% designed. The intent is to increase stream habitat complexity, pool frequency, pool depth, high-flow refugia, and over-summer rearing habitat for salmonids in Bear Creek. The Project will ultimately achieve target wood loading densities of ?very good? according to the NFMS Coastal Multispecies Recovery Plan (11+ key pieces per 100m).

Project Benefit    


The Project will increase habitat complexity, density of large wood (LW), and improve pool frequency and depth in the project reach by increasing the overall density of key LW pieces from 133 pieces/mile to 233 pieces/mile.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated 1.90

Funding Details

SourceFunds
PCSRF$199,130
In-Kind Other$98,325
Report Total:$297,455


Project Map



Worksites

1611968184196    


  • Worksite Identifier: 1611968184196
  • Start Date:
  • End Date:
Area Description
Bear Creek

Location Information

  • Basin: Northern California Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 39.875736
  • Longitude: -123.837722

ESU

  • California Coastal Chinook Salmon ESU
  • Central California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding
      •      . . . . C.4.b Total length of instream habitat treated
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement
        •      . . . . . . C.4.d.6 Yards of average stream-width at mid-point of channel structure placement project (Yards)
        •      . . . . . . C.4.d.7 Number of structures placed in channel