Mattole Headwaters Instream Habitat Planning Project
Salmonid Restoration Planning and Assessments
|
1578342566597 | N. CA - S. OR and CA Coast | 04/20/2020 | 03/31/2023 | 2018 | Ongoing | 04/13/2022 | |
| |
Description
The purpose of the Project is to assess salmonid habitat and create a plan to improve salmonid rearing habitat with instream structures in the Mattole headwaters and four tributaries. The Project is necessary because the four tributaries have very poor rearing habitat due to land use impacts and lack of instream wood. Pools are shallow and do not withstand summer drought.
Floodplains are disconnected and there is very little refuge from winter high flows.
Therefore, the planning strategy for the tributaries will prioritize structure designs
that increase pool depth and frequency and connection to inset floodplains
Project Benefit
The specific objective of the Project is to perform preliminary planning with proposed treatments and expected benefits on specific reaches of the Mattole headwaters and four tributary streams. This objective will be achieved through 1) performing habitat and geomorphic assessments, topographic surveys and hydraulic modeling; 2) preparing an options analysis, basis of design reports and 30%, 65%, 90%, and 100% designs with CDFW and Technical Advisory Committee review period of each phase and; 3) conducting a CEQA process with preparation of Mitigated Negative Declaration documents.
Funding Details |
PCSRF | $182,280 |
In-Kind Donated Labor | $47,093 |
In-Kind Other | $142,174 |
Report Total: | $371,547 |
|
| |
Worksites
1578342566820
- Worksite Identifier: 1578342566820
- Start Date:
- End Date:
Area Description
Upper Mainstem Mattole
Location Information
- Basin: Northern California Coastal
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N. CA - S. OR and CA Coast
- Latitude: 39.991683
- Longitude: -123.925786
ESU
- California Coastal Chinook Salmon ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
- Northern California Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding .00
- . . B.0.b.1
Area Encompassed
- . . B.0.b.2
Stream Miles Affected
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding
- . . . . B.1.b.8
Conducting habitat restoration scoping and feasibility studiesY (Y/N)
- . . . . . . B.1.b.8.a
- . . . . . . B.1.b.8.b
Description and scope of the plan implemented | |
|
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
|
1578342566823
- Worksite Identifier: 1578342566823
- Start Date:
- End Date:
Area Description
Mainstem Mattole Baker to Gibson
Location Information
- Basin: Northern California Coastal
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N. CA - S. OR and CA Coast
- Latitude: 40.009387
- Longitude: -123.931598
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding .00
- . . B.0.b.1
Area Encompassed
- . . B.0.b.2
Stream Miles Affected
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding
- . . . . B.1.b.8
Conducting habitat restoration scoping and feasibility studiesY (Y/N)
- . . . . . . B.1.b.8.a
- . . . . . . B.1.b.8.b
Description and scope of the plan implemented | |
|
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
|
1578342566826
- Worksite Identifier: 1578342566826
- Start Date:
- End Date:
Area Description
Mainstem Mattole at Thorn Junction
Location Information
- Basin: Northern California Coastal
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N. CA - S. OR and CA Coast
- Latitude: 40.061329
- Longitude: -123.961688
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding .00
- . . B.0.b.1
Area Encompassed
- . . B.0.b.2
Stream Miles Affected
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding
- . . . . B.1.b.8
Conducting habitat restoration scoping and feasibility studiesY (Y/N)
- . . . . . . B.1.b.8.a
- . . . . . . B.1.b.8.b
Description and scope of the plan implemented | |
|
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
|
1578342566832
- Worksite Identifier: 1578342566832
- Start Date:
- End Date:
Area Description
Baker Creek
Location Information
- Basin: Northern California Coastal
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N. CA - S. OR and CA Coast
- Latitude: 40.008874
- Longitude: -123.93446
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding .00
- . . B.0.b.1
Area Encompassed
- . . B.0.b.2
Stream Miles Affected
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding
- . . . . B.1.b.8
Conducting habitat restoration scoping and feasibility studiesY (Y/N)
- . . . . . . B.1.b.8.a
- . . . . . . B.1.b.8.b
Description and scope of the plan implemented | |
|
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
|
1578342566835
- Worksite Identifier: 1578342566835
- Start Date:
- End Date:
Area Description
Vanauken Creek
Location Information
- Basin: Northern California Coastal
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N. CA - S. OR and CA Coast
- Latitude: 40.052403
- Longitude: -123.956588
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding .00
- . . B.0.b.1
Area Encompassed
- . . B.0.b.2
Stream Miles Affected
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding
- . . . . B.1.b.8
Conducting habitat restoration scoping and feasibility studiesY (Y/N)
- . . . . . . B.1.b.8.a
- . . . . . . B.1.b.8.b
Description and scope of the plan implemented | |
|
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
|
1578342566838
- Worksite Identifier: 1578342566838
- Start Date:
- End Date:
Area Description
McKee Creek
Location Information
- Basin: Northern California Coastal
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N. CA - S. OR and CA Coast
- Latitude: 40.063774
- Longitude: -123.964458
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding .00
- . . B.0.b.1
Area Encompassed
- . . B.0.b.2
Stream Miles Affected
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding
- . . . . B.1.b.8
Conducting habitat restoration scoping and feasibility studiesY (Y/N)
- . . . . . . B.1.b.8.a
- . . . . . . B.1.b.8.b
Description and scope of the plan implemented | |
|
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
|
1578342566829
- Worksite Identifier: 1578342566829
- Start Date:
- End Date:
Area Description
Lost River
Location Information
- Basin: Northern California Coastal
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N. CA - S. OR and CA Coast
- Latitude: 39.993468
- Longitude: -123.923786
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding .00
- . . B.0.b.1
Area Encompassed
- . . B.0.b.2
Stream Miles Affected
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding
- . . . . B.1.b.8
Conducting habitat restoration scoping and feasibility studiesY (Y/N)
- . . . . . . B.1.b.8.a
- . . . . . . B.1.b.8.b
Description and scope of the plan implemented | |
|
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
|
|
|