The objective of this project is to remove two fish passage barriers located on Dakota Creek tributaries in northwest Whatcom County. Two barrier culverts will be replaced on the Ruhl property using the WDFW no-slope design option. The project will improve passage for coho salmon, Steelhead, and resident and sea-run cutthroat to 1.5 miles of upstream spawning and rearing habitat.
Project Benefit
The goal of the project is to connect isolated habitat to increase the range and distribution of salmon.
The objective of the project is to increase access to areas blocked by human-caused impediments.
Accomplishments
Fish Passage |
Barriers Removed |
2 |
2 |
Miles Opened |
1.47 |
1.47 |
Funding Details |
State | $28,445 |
Report Total: | $28,445 |
|
| |
Worksites
1-Ruhl
- Worksite Identifier: 1-Ruhl
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Puget Sound
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Puget Sound
- Latitude: 48.98025345
- Longitude: -122.61001824
ESU
- Puget Sound/Strait of Georgia Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
None |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.b.1
Length of stream made accessible 1.47
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 2
- . . . . C.2.c.1
Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
- . . . . . . C.2.c.2
Number of blockages/impediments/barriers removed/altered 2
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade 1.47
- . . . . C.2.i.1
Road stream crossing removal Y (Y/N)
- . . . . . . C.2.i.3
Miles of stream made accessible by road stream crossing removal .00
|
|