16-1998 P | Willamette and Interior Columbia | 12/07/2016 | 12/07/2018 | 2016 | Completed | 04/19/2022 | |
| |
Description
The project consisted of a preliminary design for the removal of 3 fish barriers on Spring Creek and its tributaries. One fish barrier removal was completed by the design of a bridge. The other two barrier removals were completed by the design of the road realignment. The project design elements that were completed were a bridge design, a road realignment civil design including the existing Lower Spring Creek alignment decommission plan, a wetland survey with a wetland mitigation report, and a cultural resource survey was conducted. In addition, a construction cost estimate was completed. All completed design elements comply with WDFW fish passage requirements and salmon restoration requirements.
Project Benefit
The project was scheduled to be completed by 12/31/2018. It was completed 11/30/2018. The completed design will remove 3 fish barriers and rehabilitate salmon habitat.
Funding Details |
PCSRF | $88,377 |
Other | $62,932 |
Report Total: | $151,309 |
|
| |
Worksites
1-Lower Spring Creek Road
- Worksite Identifier: 1-Lower Spring Creek Road
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Middle Columbia
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Willamette and Interior Columbia
- Latitude: 45.80308655
- Longitude: -121.49915787
ESU
- Lower Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 151,309.00
- . . B.0.b.1
Area Encompassed 19.0
- . . B.0.b.2
Stream Miles Affected .25
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 151,309.00
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
Name of plan implemented | |
Klickitat Lead Entity Region Salmon Recovery Strategy (August 2015) |
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
Naturally spawned steelhead in the White Salmon River are included in the Mid-Columbia Steelhead DPS, which is listed as threatened under the ESA (71 FR 834)
And the described project occurs in a high priority area and Naturally spawned steelhead are Tier 1 priority stock due to their ESA listing status. (pg. 31 |
|
|