Big Quilcene River ELJ Restoration Phase 2
Salmonid Habitat Restoration and Acquisition
|
08-1990 R | Puget Sound | 03/01/2009 | 12/22/2011 | 2006 | Completed | 04/19/2022 | |
| |
Description
This project was completed as discussed with some changes that resulted in a better design for the landowners.
Project Benefit
The goal of the project is to improve instream morphology and habitat in salmon bearing streams. The objective of the project is to increase instream cover, spawning, and resting areas.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.25 |
.25 |
Riparian Habitat |
Stream Miles Treated |
.25 |
.25 |
Acres Treated |
5.0 |
5.0 |
Funding Details |
PCSRF | $263,000 |
State | $229,904 |
Other | $123,916 |
Report Total: | $616,820 |
|
| |
Worksites
1-Quilcene River
- Worksite Identifier: 1-Quilcene River
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Puget Sound
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Puget Sound
- Latitude: 47.81109371
- Longitude: -122.90589402
ESU
- Puget Sound Steelhead DPS
- Puget Sound/Strait of Georgia Coho Salmon ESU
- Hood Canal Summer-run Chum Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 605,284.14
- . . C.0.b
Length of stream treated/protected .25
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Hood Canal Summer Chum Salmon Recovery Plan |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 605,284.14
- . . . . C.4.b
Total length of instream habitat treated .25
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity .25
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity .10
- . . . . . . C.4.c.5
Acres of off-channel or floodplain connected through channel reconfiguration and connectivity 3.0
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity 7
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .25
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 7
- . . . . . . C.4.d.7
Number of structures placed in channel 7
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .20
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding .00
- . . . . C.5.b.1
Total riparian miles streambank treated .25
- . . . . C.5.b.2
Total Riparian Acres Treated 5.0
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Firs and other native vegetation. |
- . . . . . . C.5.c.3
Acres planted in riparian 2.0
|
|