08-1971 R | Puget Sound | 12/12/2008 | 12/31/2010 | 2008 | Completed | 04/19/2022 | |
| |
Description
The overall project will restore approximately 1.5 acres of stream mouth, intertidal, and fringe marsh habitat as well as 0.5 acres of riparian habitat. The Strawberry Plant property is one of the most significant opportunities to restore lost habitat in Eagle Harbor and will benefit salmon, other fish, shellfish, birds, and other wildlife. The property is a public park currently owned by the City of Bainbridge Island and the ownership will eventual be transferred to the Bainbridge Island Metropolitan Park and Recreation District and upland park planning and development will be completed. Eagle Harbor has suffered significant habitat impacts, including the historic filling of two fairly large subestuary marsh/lagoon habitats in the outer harbor that can never be restored due to Superfund reclamation. The project site is located near a recently restored salmon stream (almost 1 mile of habitat opened to chum, cutthroat, coho), 7 small stream subestuaries, 7 recently completed or in-progress nearshore restoration projects, and an aquatic conservancy area (see nearby habitat map). The project included restoration of intertidal habitat, marsh, and marine vegetation and included removing creosote piles, concrete bulkhead and rip rap, debris and fill material, and reducing impervious surfaces in the shoreline area; establishing a natural shoreline and stream mouth; and creating a salt marsh along the shoreline and stream mouth. Public recreational components related to the restoration project included establishing pedestrian public viewing and direct water access points and a non-motorized boating access area.
Project Benefit
The goal of the project is to restore estuarine and nearshore conditions and processes in the marine environment. The objective of the project is to restore shoreline habitat diversity and function.
The goal of the project is to restore native vegetation in the marine environment. The objective of the project is to restore marine riparian, intertidal, and subtidal vegetation.
Accomplishments
Estuarine Habitat |
Acres Created |
.4 |
.5 |
Acres Treated |
1.5 |
1.5 |
Upland Habitat |
Acres Treated |
.1 |
.1 |
Funding Details |
PCSRF | $298,776 |
Other | $374,221 |
Report Total: | $672,997 |
|
| |
Worksites
1-Strawberry Plant
- Worksite Identifier: 1-Strawberry Plant
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Puget Sound
- Latitude: 47.62560959
- Longitude: -122.53581781
ESU
- Puget Sound/Strait of Georgia Coho Salmon ESU
- Puget Sound/Strait of Georgia Chum Salmon ESU
- Puget Sound Steelhead DPS
- Odd-year
- Puget Sound Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 672,997.20
- . . C.0.b
Length of stream treated/protected .10
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
None |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 19,225.91
- . . . . C.6.b.1
Acres of upland habitat area treated .1
- . . . . C.6.b.2
Miles of road treated in upland area .01
- . . . . C.6.c.1
Road drainage system improvements and reconstructionY (Y/N)
- . . . . . . C.6.c.2
Miles of road treated for drainage system improvements and reconstruction .00
- . . C.9
Estuarine/Nearshore ProjectY (Y/N)
- . . . . C.9.a
Estuarine/nearshore funding 653,771.29
- . . . . C.9.b
Total amount of estuarine/nearshore area treated 1.5
- . . . . C.9.i.1
Regrading of slopeY (Y/N)
- . . . . . . C.9.i.2
Acres of estuary treated .5
- . . . . C.9.j.1
Estuarine plant removal/controlY (Y/N)
- . . . . . . C.9.j.2
Species (Scientific) name(s) of estuarine plants removed | |
grass, weeping willow, blackberry removal along stream and shoreline |
- . . . . . . C.9.j.3
Acres of estuary treated 2.0
- . . . . C.9.k.1
Shoreline armor removal or modificationY (Y/N)
- . . . . . . C.9.k.2
Miles of shoreline treated .10
- . . . . . . C.9.k.3
Acres of shoreline treated 1.0
- . . . . C.9.l.1
Beach nourishmentY (Y/N)
- . . . . . . C.9.l.3
Miles of shoreline treated .04
- . . . . . . C.9.l.4
Acres treated .6
- . . . . C.9.n.1
Debris removalY (Y/N)
- . . . . . . C.9.n.2
Acres treated 1.2
- . . . . C.9.p.1
Exclusion devicesY (Y/N)
- . . . . . . C.9.p.2
Acres treated .1
- . . . . C.9.q.1
Creation of new estuarine area Y (Y/N)
- . . . . . . C.9.q.2
Acres of estuary created .4
|
|