Stream Bank Restoration: Fairbanks Cost Share - Phase 5

Salmonid Habitat Restoration and Acquisition

Instream Habitat Riparian Habitat
Project IDAK54005
Recovery Domains -
Start Date03/01/2021
End Date11/30/2023
Year2020
StatusCompleted
Last Edited03/13/2024
 
1 - 1

Description    


From 2021 through 2023, staff received interest from 23 private landowners and Alaska State Parks for work along the Chena River, Salcha River, West Fork Chena River, and the Chatanika River. From those proposals, ADF&G helped fund or gave technical advice on nine streambank rehabilitation and stabilization projects. As a result, this grant helped fund the removal of 55 meters of structures detrimental to salmon, rehabilitation of 598 meters of streambank, revegetation of 0.137 acres of riparian area, and protection of 218 meters of streambank through a combination of cabled spruce trees, rootwads, and fencing.



At four sites, structures detrimental to juvenile salmon were removed from the riparian area (including bulkheads, gabions, and rip rap embankments); at 8 sites, streambanks were stabilized utilizing: brush layering (7 sites), rootwads (3 sites), and spruce tree revetments (1 site); at 1 site, fencing was installed to protect riparian habitat; and at all 9 sites, riparian habitat was revegetated using native vegetated mat (8 sites), willows (9 sites), and, at one site, a combination of bluejoint, sedges, fireweed, nagoonberries, and Arctic rose.

Project Benefit    


This project will benefit fish habitat directly by: removal of at least 91 meters of detrimental structures from streams; conservation of at least 610 meters of streambank; and rehabilitation of at least 610 meters of streambank. These results will help ensure healthy fish populations, good fish habitat, riparian vegetation and function, and opportunities for subsistence fishing.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .13 .05
Riparian Habitat
  Stream Miles Treated .19 .04
  Acres Treated .9 .1

Funding Details

SourceFunds
PCSRF$212,124
State$19,010
Other$521,110
Report Total:$752,244


Project Map



Worksites

202101    


  • Worksite Identifier: 202101
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 64.82864
  • Longitude: -147.85927

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 61,700.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 38,921.00
      •      . . . . C.4.b Total length of instream habitat treated .01
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .01
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 22,779.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .01
        •      . . . . C.5.b.2 Total Riparian Acres Treated .1
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Vegetative mat and salix salix
          •      . . . . . . C.5.c.3 Acres planted in riparian .1
        •      . . . . C.5.j.1 Debris/structures removalY (Y/N)
          •      . . . . . . C.5.j.2 Acres of riparian treated for debris/structures removal .1

202102    


  • Worksite Identifier: 202102
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 64.82864
  • Longitude: -147.85927

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 17,085.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 8,542.00
      •      . . . . C.4.b Total length of instream habitat treated .01
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .01
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 8,543.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .01
        •      . . . . C.5.b.2 Total Riparian Acres Treated .1
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Vegetative mat and salix salix
          •      . . . . . . C.5.c.3 Acres planted in riparian .1
        •      . . . . C.5.j.1 Debris/structures removalY (Y/N)
          •      . . . . . . C.5.j.2 Acres of riparian treated for debris/structures removal .1

202147    


  • Worksite Identifier: 202147
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 64.83279
  • Longitude: -147.87317

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 41,982.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 33,586.00
      •      . . . . C.4.b Total length of instream habitat treated .01
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .01
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 8,396.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .01
        •      . . . . C.5.b.2 Total Riparian Acres Treated .1
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Vegetative mat and salix salix
          •      . . . . . . C.5.c.3 Acres planted in riparian .1

202146    


  • Worksite Identifier: 202146
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 64.8458
  • Longitude: -147.7191

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 12,087.00
    •      . . C.0.b Length of stream treated/protected .08
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.5 Riparian Habitat ProjectY (Y/N)
      •      . . . . C.5.a Riparian Habitat Funding 12,087.00
      •      . . . . C.5.b.1 Total riparian miles streambank treated .08
      •      . . . . C.5.b.2 Total Riparian Acres Treated .1
      •      . . . . C.5.c.1 Riparian plantingY (Y/N)
        •      . . . . . . C.5.c.2
          Species of plants planted in riparian
          Calamagrostis canadensis; Carex; Chamerion angustifolium; Rubus arcticus; Rosa acicularis; Salix
        •      . . . . . . C.5.c.3 Acres planted in riparian .1

202256    


  • Worksite Identifier: 202256
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 64.8093
  • Longitude: -147.90964

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 61,594.00
    •      . . C.0.b Length of stream treated/protected .02
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 15,399.00
      •      . . . . C.4.b Total length of instream habitat treated .02
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .02
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 46,195.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .02
        •      . . . . C.5.b.2 Total Riparian Acres Treated .1
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Vegetative mat
          •      . . . . . . C.5.c.3 Acres planted in riparian .1
        •      . . . . C.5.d.1 FencingY (Y/N)
          •      . . . . . . C.5.d.2 Miles of fence along stream .02
        •      . . . . C.5.j.1 Debris/structures removalY (Y/N)
          •      . . . . . . C.5.j.2 Acres of riparian treated for debris/structures removal .1

202255    


  • Worksite Identifier: 202255
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 64.82865
  • Longitude: -147.85927

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 16,053.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 12,040.00
      •      . . . . C.4.b Total length of instream habitat treated .01
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .01
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 4,013.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .01
        •      . . . . C.5.b.2 Total Riparian Acres Treated .1
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Vegetative mat
          •      . . . . . . C.5.c.3 Acres planted in riparian .1
        •      . . . . C.5.j.1 Debris/structures removalY (Y/N)
          •      . . . . . . C.5.j.2 Acres of riparian treated for debris/structures removal .1

202259    


  • Worksite Identifier: 202259
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 64.85079
  • Longitude: -147.41112

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 252,086.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 201,669.00
      •      . . . . C.4.b Total length of instream habitat treated .01
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .01
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 50,417.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .01
        •      . . . . C.5.b.2 Total Riparian Acres Treated .1
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Vegetative mat
          •      . . . . . . C.5.c.3 Acres planted in riparian .1
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .01

202318    


  • Worksite Identifier: 202318
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 64.85427
  • Longitude: -147.87384

ESU

  • Un-Named ESU Chinook

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 28,778.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 14,389.00
      •      . . . . C.4.b Total length of instream habitat treated .01
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .01
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 14,389.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .01
        •      . . . . C.5.b.2 Total Riparian Acres Treated .1
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Vegetative mat and salix
          •      . . . . . . C.5.c.3 Acres planted in riparian .1

202315 (former placeholder)    


  • Worksite Identifier: 202315 (former placeholder)
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Tanana River (190803)
  • Subbasin: Salcha River (19080305)
  • Watershed: Outlet Salcha River (1908030508)
  • Subwatershed: Harding Lake-Salcha River (190803050809)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 64.85282
  • Longitude: -147.4135

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 260,879.00
    •      . . C.0.b Length of stream treated/protected .05
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 208,703.00
      •      . . . . C.4.b Total length of instream habitat treated .05
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .05
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 52,176.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .03
        •      . . . . C.5.b.2 Total Riparian Acres Treated .1
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Native vegetative mat
          •      . . . . . . C.5.c.3 Acres planted in riparian .1