Restoring Connectivity for Chinook and Coho Salmon in the Little Tonsina River (Bridge 568)
Salmonid Habitat Restoration and Acquisition
|
AK54008 | - | 03/01/2021 | 11/30/2024 | 2020 | Completed | 05/05/2025 | |
| |
Description
The Copper River Watershed Project worked with partners from Alaska Department of Fish and Game, Alaska Department of Transportation and Public Facilities (DOT), U.S. Fish and Wildlife Service, BLM, Chugach Alaska Corporation, and the Copper River Native Association to remove a critical barrier to fish passage on the Little Tonsina River through replacement of a blocked, dual culvert structure to a bridge. The new bridge allows for better fish passage and the completed 100% design employed USFWS guidelines for maximizing ecological function including better flood mitigation and formation of a more natural stream.
This project utilized funds from PCSRF award NA23NMF4380392. No funds from either award were used past the end dates.
Project Benefit
Replacing the undersized culverts of the Lower Tonsina River crossing will open access to approximately 113 km of upstream habitat for Chinook and coho salmon.
Accomplishments
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
70.40 |
70.40 |
Funding Details |
PCSRF | $400,148 |
State | $982,800 |
Other | $3,018,420 |
Report Total: | $4,401,368 |
|
| |
Worksites
48584056
- Worksite Identifier: 48584056
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Copper River (190201)
- Subbasin: Middle Copper River (19020102)
- Watershed: Little Tonsina River-Tonsina River (1902010237)
- Subwatershed: Outlet Little Tonsina River (190201023705)
- State: Alaska
- Recovery Domain:
- Latitude: 61.59437
- Longitude: -145.22308
ESU
- Un-Named ESU Chinook
- Un-Named ESU Coho
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 4,401,368.00
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 4,401,368.00
- . . . . C.2.b.1
Length of stream made accessible 70.40
- . . . . C.2.b.2
Square miles of streambed made accessible18.7 (Square miles)
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded 1
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade 70.40
|
|