Restoring Connectivity for Chinook and Coho Salmon in the Little Tonsina River (Bridge 568)
Salmonid Habitat Restoration and Acquisition
|
AK54008 | - | 03/01/2021 | 11/30/2024 | 2020 | Ongoing | 01/14/2025 | |
| |
Description
The Little Tonsina River is a largely pristine, intact sub-drainage in the Copper River watershed that supports both Chinook and coho adult and juvenile salmon populations. This project will remove a dual culvert structure, the only barrier at the bottom of the Little Tonsina drainage. Currently the culverts are blocking up and downstream movement of juvenile fish and are a partial barrier to migrating adults. Project partners Copper River Watershed Project (CRWP), Alaska Department of Fish & Game (ADF&G), Alaska Department of Transportation & Public Facilities (ADOT/PF), U.S. Fish & Wildlife Service (USFWS), Bureau of Land Management (BLM), and Chugach Alaska Corporation will replace the two adjacent undersized culverts with a single-lane bridge that has a single clear span of at least two times the bankfull channel width, restoring critical connectivity to an estimated 113 km of upstream habitat.
Project Benefit
Replacing the undersized culverts of the Lower Tonsina River crossing will open access to approximately 113 km of upstream habitat for Chinook and coho salmon.
Accomplishments
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
|
70.40 |
Funding Details |
PCSRF | $400,150 |
State | $1,000,000 |
Other | $2,106,636 |
Report Total: | $3,506,786 |
|
| |
Worksites
48584056
- Worksite Identifier: 48584056
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Copper River (190201)
- Subbasin: Middle Copper River (19020102)
- Watershed: Little Tonsina River-Tonsina River (1902010237)
- Subwatershed: Outlet Little Tonsina River (190201023705)
- State: Alaska
- Recovery Domain:
- Latitude: 61.59437
- Longitude: -145.22308
ESU
- Un-Named ESU Chinook
- Un-Named ESU Coho
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding
- . . . . C.2.b.1
Length of stream made accessible
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade
|
|