Stream Bank Restoration: Kenai Cost Share - Phase 5

Salmonid Habitat Restoration and Acquisition

Instream Habitat Riparian Habitat
Project IDAK53017
Recovery Domains -
Start Date11/01/2020
End Date02/28/2023
Year2019
StatusOngoing
Last Edited03/22/2022
 
1 - 1

Description    


The Alaska Department of Fish and Game (ADF&G) will partner with the U.S. Fish and Wildlife Service (USFWS), the Kenai Soil and Water Conservation District (KSWCD), Alaska State Parks, local governments, and landowners to assess, prioritize, and conduct restoration and rehabilitation projects on public and private lands over a two-year period. Funding, technical project design assistance, and on-the-ground project construction oversight will be provided through a financial incentive program (the Cost Share program) directed towards private landowners and public land managers on the Kenai Peninsula.

Project Benefit    


This project will benefit fish habitat directly by the removal of at least 610 meters of detrimental structures from streams; the conservation and sustaining of at least 610 meters of riverbank; and the rehabilitation and enhancement of at least 610 meters of riverbank.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .15
Riparian Habitat
  Stream Miles Treated .05
  Acres Treated .1

Funding Details

SourceFunds
PCSRF$194,128
State$35,200
Other$132,745
Report Total:$362,073


Project Map



Worksites

48484616    


  • Worksite Identifier: 48484616
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Kenai Peninsula
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 59.790605
  • Longitude: -151.856683

ESU

  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding
      •      . . . . C.4.b Total length of instream habitat treated
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding
        •      . . . . C.5.b.1 Total riparian miles streambank treated
        •      . . . . C.5.b.2 Total Riparian Acres Treated
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
        •      . . . . C.5.e.1 Riparian exclusionY (Y/N)
        •      . . . . C.5.j.1 Debris/structures removalY (Y/N)