Instream Flow Protection: Southeast - Phase 16

Salmonid Habitat Restoration and Acquisition

Instream Flow
Project IDAK52014_ROW
Recovery Domains -
Start Date07/01/2020
End Date06/30/2021
Year2018
StatusCompleted
Last Edited01/25/2024
 
1 - 1

Description    


This project finalized two reservation of water applications for important salmon streams in Southeast Alaska to be submitted to the Alaska Department of Natural Resources for adjudication in December 2022 (Hatchery Creek reach A and Lawson Creek reach A). The remaining two applications (for Deer Creek reach A and Ahrnklin River reach A) were begun but not completed and will be reported when appropriate under another project.

Project Benefit    


The rivers of SE AK support some of North America’s most viable and productive salmon and steelhead fisheries. Salmon and steelhead depend on sufficient quantities of water to meet their spawning, rearing, incubation, overwintering, and migration habitat requirements. This project will benefit salmon and steelhead populations (including those used for important subsistence fisheries) throughout SE AK by legally reserving water needed to sustain their production.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$37,439
State$14,025
Report Total:$51,464


Project Map



Worksites

Ahrnklin River    


  • Worksite Identifier: Ahrnklin River
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Gulf of Alaska (190104)
  • Subbasin: Yakutat Bay-Gulf of Alaska (19010405)
  • Watershed: Ahrnklin River (1901040518)
  • Subwatershed: Upper Ahrnklin River (190104051801)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 59.461168
  • Longitude: -139.102349

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chinook
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,789.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 6,789.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow .00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year0 (cfs)

Lawson Creek    


  • Worksite Identifier: Lawson Creek
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Southeast Alaska (190103)
  • Subbasin: Lynn Canal (19010301)
  • Watershed: Mendenhall River-Frontal Gastineau Channel (1901030106)
  • Subwatershed: Salmon Creek-Frontal Gastineau Channel (190103010606)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 58.2847
  • Longitude: -134.4111

ESU

  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 18,942.00
    •      . . C.0.b Length of stream treated/protected .40
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 18,942.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow .40
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year22 (cfs)

Deer Creek    


  • Worksite Identifier: Deer Creek
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Central Southeast Alaska (190102)
  • Subbasin: Baranof Island (19010212)
  • Watershed: Port Lucy-Frontal Chatham Strait (1901021203)
  • Subwatershed: Deer Lake-Frontal Chatham Strait (190102120307)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 56.5194
  • Longitude: -134.6694

ESU

  • Un-Named ESU Coho
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,788.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 6,788.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow .00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year0 (cfs)

Hatchery Creek    


  • Worksite Identifier: Hatchery Creek
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin: Prince of Wales (19010103)
  • Watershed: Logjam Creek (1901010301)
  • Subwatershed: Hatchery Creek (190101030102)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 55.923864
  • Longitude: -132.9598

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 18,945.00
    •      . . C.0.b Length of stream treated/protected 4.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 18,945.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 4.00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year140 (cfs)