Start Date05/15/2013
End Date11/05/2013
Year2012
StatusCompleted
Last Edited07/21/2022
 
1 - 1

Description    


This project replaced a failing, undersized culvert on Halo Creek with a appropriately sized corrugated squash pipe culvert. This project also enhanced a wetland with a hardened crossing, invasive plant control, bank shaping, and creation of a berm for reptile and amphibian habitat improvements.

Project Benefit    


The project will improve instream habitat, and hence productivity, in streams that are inhabited by Coho and Steelhead.

Accomplishments

Metric Completed Originally
Proposed
Wetland Habitat
  Acres Created
  Acres Treated 20.0 .0
Fish Passage
  Barriers Removed
  Miles Opened 2.50 2.75

Funding Details

SourceFunds
State$7,418
Other$30,862
In-Kind Donated Labor$1,000
Report Total:$39,280


Project Map



Worksites

20130150    


  • Worksite Identifier: 20130150
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Oregon Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 43.5988
  • Longitude: -123.2688

ESU

  • Oregon Coast Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 39,279.83
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Elk Creek Watershed Council Action Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 9,803.96
      •      . . . . C.2.b.1 Length of stream made accessible 2.50
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade 2.50
      •      . . C.8 Wetland ProjectY (Y/N)
        •      . . . . C.8.a Wetland funding 29,475.87
        •      . . . . C.8.b Total acres of wetland area treated 20.0
        •      . . . . C.8.d.1 Wetland plant removal/controlY (Y/N)
          •      . . . . . . C.8.d.2
            Species (scientific) name(s) of wetland plants removed
            invasive blackberry
          •      . . . . . . C.8.d.3 Acres of wetland treated 20.0
        •      . . . . C.8.e.1 Wetland improvement/restorationY (Y/N)