Bottom Creek Fish Passage Culvert Upgrades

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat
Project IDOWEB 208-2010-5917
Recovery DomainsOregon Coast
Start Date12/10/2007
End Date02/17/2011
Year2007
StatusCompleted
Last Edited07/21/2022
 
1 - 1

Description    


This project placed large wood instream; removed culverts or structures and did not replace them; replaced culverts or structures with a bridge; replaced culverts or structures with culverts placed embedded or flat; replaced culverts or structures with open bottom arch culverts.

Project Benefit    


OWRI: improve/increase stream gravel recruitment; improve/increase stream interaction with floodplain; improve/increase stream over-winter habitat; improve/increase stream rearing habitat; improve/increase stream spawning habitat; improve/increase stream structure & complexity; improve/increase stream summer habitat;

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .10
Fish Passage
  Barriers Removed
  Miles Opened 3.09

Funding Details

SourceFunds
State$122,524
Other$155,780
In-Kind Other$13,750
Report Total:$292,054


Project Map



Worksites

20100269    


  • Worksite Identifier: 20100269
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Oregon Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 43.36602008
  • Longitude: -123.71338726

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 180,913.72
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Williams River Watershed Analysis/1996/Weyerhaeuser Company
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 180,913.72
      •      . . . . C.2.b.1 Length of stream made accessible 1.96
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade 1.96

20100271    


  • Worksite Identifier: 20100271
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Oregon Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 43.36467052
  • Longitude: -123.70778971

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,727.76
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Williams River Watershed Analysis/1996/Weyerhaeuser Company
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 6,727.76
      •      . . . . C.2.b.1 Length of stream made accessible .40
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.i.1 Road stream crossing removal Y (Y/N)
        •      . . . . . . C.2.i.2 Number of road crossings removed 1
        •      . . . . . . C.2.i.3 Miles of stream made accessible by road stream crossing removal .40

20100273    


  • Worksite Identifier: 20100273
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Oregon Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 43.35979022
  • Longitude: -123.75122814

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 16,636.47
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Williams River Watershed Analysis/1996/Weyerhaeuser Company
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 16,636.47
      •      . . . . C.2.b.1 Length of stream made accessible .53
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade .53

20100274    


  • Worksite Identifier: 20100274
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Oregon Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 43.34563689
  • Longitude: -123.78143087

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 80,895.55
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Williams River Watershed Analysis/1996/Weyerhaeuser Company
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 80,895.55
      •      . . . . C.2.b.1 Length of stream made accessible .20
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade .20

20100277    


  • Worksite Identifier: 20100277
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Oregon Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 43.35958322
  • Longitude: -123.7504713

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,880.27
    •      . . C.0.b Length of stream treated/protected .10
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Williams River Watershed Analysis/1996/Weyerhaeuser Company
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 6,880.27
      •      . . . . C.4.b Total length of instream habitat treated .10
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .10
        •      . . . . . . C.4.d.7 Number of structures placed in channel 2