2007 Upper Necanicum Restoration

Salmonid Habitat Restoration and Acquisition

Instream Habitat Riparian Habitat
Project IDOWEB 207-265-5565
Recovery DomainsOregon Coast
Start Date05/01/2007
End Date02/05/2010
Year2006
StatusCompleted
Last Edited07/21/2022
 
1 - 1

Description    


This project placed large wood instream; planted conifer trees in the riparian area; planted riparian vegetation.

Project Benefit    


OWRI: improve/increase stream gravel recruitment; improve/increase stream interaction with floodplain; improve/increase stream structure & complexity; increase future LWD recruitment to stream;

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .50
Riparian Habitat
  Stream Miles Treated 2.50
  Acres Treated 7.5

Funding Details

SourceFunds
State$46,095
Other$10,000
In-Kind Volunteers$6,266
In-Kind Donated Labor$4,128
In-Kind Other$16,810
Report Total:$83,299


Project Map



Worksites

20090271    


  • Worksite Identifier: 20090271
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Oregon Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 45.91215354
  • Longitude: -123.72206077

ESU

  • Oregon Coast Chinook Salmon ESU
  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 83,299.03
    •      . . C.0.b Length of stream treated/protected 1.25
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Necanicum Watershed Assessment/2002/E&S Environmental
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 52,754.32
      •      . . . . C.4.b Total length of instream habitat treated .50
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .50
        •      . . . . . . C.4.d.7 Number of structures placed in channel 15
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 30,544.71
        •      . . . . C.5.b.1 Total riparian miles streambank treated 2.50
        •      . . . . C.5.b.2 Total Riparian Acres Treated 7.5
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Tsuga heterophylla; Picea sitchensis; Thuja plicata;
          •      . . . . . . C.5.c.3 Acres planted in riparian 7.5
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting 2.50