Palouse Basins Stream Connectivity & Riparian Enhancement
Salmonid Habitat Restoration and Acquisition
|
OWEB 207-065-3510 | Oregon Coast | 12/04/2006 | 03/20/2012 | 2006 | Completed | 07/21/2022 | |
| |
Description
This project added culverts at locations other than above stream crossings; established/maintained riparian plants; installed riparian fencing; planted conifer and hardwood trees in the riparian area; planted conifer trees in the riparian area; planted riparian vegetation; replaced culverts or structures with culverts placed embedded or flat; replaced structures to meet 50+ year flow requirements; stabilized a stream bank by resloping the bank.
Project Benefit
OWRI: decrease erosion/stream sedimentation; improve/increase fish passage; improve/increase stream interaction with floodplain; improve/increase stream off-channel habitat; improve/increase stream over-winter habitat; improve/increase stream rearing habitat; improve/increase stream slow water habitat; increase/improve aquatic habitat;
Accomplishments
Instream Habitat |
Stream Miles Treated |
.30 |
|
Riparian Habitat |
Stream Miles Treated |
1.11 |
|
Acres Treated |
2.2 |
|
Upland Habitat |
Acres Treated |
5.9 |
|
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
1.60 |
|
Funding Details |
State | $102,509 |
Other | $75,405 |
In-Kind Donated Labor | $20,872 |
Report Total: | $198,786 |
|
| |
Worksites
20070483
- Worksite Identifier: 20070483
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Oregon Coastal
- Subbasin:
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Oregon Coast
- Latitude: 43.49874893
- Longitude: -124.12958536
ESU
- Oregon Coast Chinook Salmon ESU
- Lower Columbia River Coho Salmon ESU
- Oregon Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 38,634.12
- . . C.0.b
Length of stream treated/protected .50
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Coos Bay Lowland Assessment and Restoration Plan/2006/Coos Watershed Association |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 9,658.53
- . . . . C.4.b
Total length of instream habitat treated .30
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .30
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 28,975.59
- . . . . C.5.b.1
Total riparian miles streambank treated .50
- . . . . C.5.b.2
Total Riparian Acres Treated 1.1
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Acer macrophyllum; Acer circinatum; Physocarpus capitatus; Alnus viridis; Rhododendron albiflorum; Cornus sericea; Salix spp.; Abies grandis; Picea sitchensis; Tsuga heterophylla; Thuja plicata; |
- . . . . . . C.5.c.3
Acres planted in riparian 1.1
- . . . . . . C.5.c.4
Miles of streambank treated with riparian planting .50
- . . . . C.5.d.1
FencingY (Y/N)
- . . . . . . C.5.d.2
Miles of fence along stream .50
- . . . . . . C.5.d.3
Acres of riparian area protected by fencing 1.1
20110312
- Worksite Identifier: 20110312
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Oregon Coastal
- Subbasin:
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Oregon Coast
- Latitude: 43.48337945
- Longitude: -124.18114733
ESU
- Oregon Coast Chinook Salmon ESU
- Lower Columbia River Coho Salmon ESU
- Oregon Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 17,462.48
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Coos Bay Lowlands Assessment/2006/Coos Watershed Association |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 17,462.48
- . . . . C.2.b.1
Length of stream made accessible .10
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 1
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade .10
20110311
- Worksite Identifier: 20110311
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Oregon Coastal
- Subbasin:
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Oregon Coast
- Latitude: 43.48232916
- Longitude: -124.1815661
ESU
- Oregon Coast Chinook Salmon ESU
- Lower Columbia River Coho Salmon ESU
- Oregon Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 45,427.23
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Coos Bay Lowlands Assessment/2006/Coos Watershed Association |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 45,427.23
- . . . . C.2.b.1
Length of stream made accessible .50
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 1
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade .50
20110209
- Worksite Identifier: 20110209
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Oregon Coastal
- Subbasin:
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Oregon Coast
- Latitude: 43.49862971
- Longitude: -124.12961332
ESU
- Oregon Coast Chinook Salmon ESU
- Lower Columbia River Coho Salmon ESU
- Oregon Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 9,554.52
- . . C.0.b
Length of stream treated/protected .61
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Coos Bay Lowlands Assessment/2006/Coos Watershed Association |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 9,554.52
- . . . . C.5.b.1
Total riparian miles streambank treated .61
- . . . . C.5.b.2
Total Riparian Acres Treated 1.1
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Grand fir, Western hemlock, Western red cedar, Vine maple, Pacific ninebark, Red osier dogwood, Cascara & Willow. |
- . . . . . . C.5.c.3
Acres planted in riparian 1.1
- . . . . . . C.5.c.4
Miles of streambank treated with riparian planting .61
20070047
- Worksite Identifier: 20070047
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Oregon Coastal
- Subbasin:
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Oregon Coast
- Latitude: 43.50691465
- Longitude: -124.12483103
ESU
- Oregon Coast Chinook Salmon ESU
- Lower Columbia River Coho Salmon ESU
- Oregon Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 87,707.41
- . . C.0.b
Length of stream treated/protected .03
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Coos Bay Lowland Assessment and Restoration Plan/2006/Coos Watershed Association |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 49,664.60
- . . . . C.2.b.1
Length of stream made accessible 1.00
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 3
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 3
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade 1.00
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 38,042.81
- . . . . C.6.b.1
Acres of upland habitat area treated 5.9
- . . . . C.6.b.2
Miles of road treated in upland area .49
- . . . . C.6.c.1
Road drainage system improvements and reconstructionY (Y/N)
- . . . . . . C.6.c.2
Miles of road treated for drainage system improvements and reconstruction .49
|
|