Birch Cr Fish Passage/Irrigation Efficiency

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat Upland Habitat And Sediment
Project IDOWEB 204-167-854
Recovery DomainsInterior Columbia
Start Date08/14/2003
End Date12/17/2007
Year2003
StatusCompleted
Last Edited07/21/2022
 
1 - 1

Description    


This project improved an irrigation system by converting from flood to sprinkler irrigation; installed a rock/boulder V structure; modified or created a main stream channel; removed or modified diversion dam; stabilized a stream bank by using bioengineering methods.

Project Benefit    


OWRI: decrease erosion/stream sedimentation; improve/increase fish passage; improve/increase stream flow; increase/improve water conservation;

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .10
Upland Habitat
  Acres Treated 186.0
Fish Passage
  Barriers Removed 1
  Miles Opened 38.00

Funding Details

SourceFunds
State$102,889
Other$171,550
In-Kind Other$33,600
Report Total:$308,039


Project Map



Worksites

20070693    


  • Worksite Identifier: 20070693
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Middle Columbia
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Interior Columbia
  • Latitude: 45.48936956
  • Longitude: -118.82953696

ESU

  • Middle Columbia River Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 308,039.00
    •      . . C.0.b Length of stream treated/protected .10
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Umatilla/Willow Subbasin Plan/2005/Subbasin Planning Team
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 13,488.00
      •      . . . . C.2.b.1 Length of stream made accessible 38.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.c.1 Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
        •      . . . . . . C.2.c.2 Number of blockages/impediments/barriers removed/altered 1
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 101,069.00
        •      . . . . C.4.b Total length of instream habitat treated .10
        •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
          •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
          •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity .13
          •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .00
          •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 0
        •      . . . . C.4.d.1 Channel structure placementY (Y/N)
          •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
          •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .10
          •      . . . . . . C.4.d.7 Number of structures placed in channel 10
        •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
          •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
          •      . . . . . . C.4.e.3 Miles of streambank stabilized .10
        •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
          •      . . . . C.6.a Upland Habitat / Sediment Funding 193,482.00
          •      . . . . C.6.b.1 Acres of upland habitat area treated 186.0
          •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
            •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
            •      . . . . . . C.6.i.3 Upland acres managed for agriculture 186.0