Karnowsky Creek WS Restoration Project Phase 1

Salmonid Habitat Restoration and Acquisition

Instream Habitat Riparian Habitat Upland Habitat And Sediment
Project IDOWEB 201-424-380
Recovery DomainsOregon Coast
Start Date02/21/2002
End Date01/29/2006
Year2003
StatusCompleted
Last Edited07/21/2022
 
1 - 1

Description    


This project created an off-channel pond; created an off-channel pond with tributary or spring input; created an off-channel pond without tributary or spring input; created or excavated side channels; installed a log and rock/boulder flow deflector; installed a log and rock/boulder weir not below a culvert; modified or created a main stream channel; placed large wood instream; planted conifer and hardwood trees in the riparian area.

Project Benefit    


OWRI: decrease erosion/stream sedimentation; improve/increase stream flow; improve/increase stream gravel recruitment; improve/increase stream rearing habitat; improve/increase stream spawning habitat; improve/increase stream structure & complexity; increase future LWD recruitment to stream; increase future stream shading/increase vegetation to provide shade; increase streambank stabilization/protection;

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated 7.70
Riparian Habitat
  Stream Miles Treated 15.40
  Acres Treated 47.2
Upland Habitat
  Acres Treated .1

Funding Details

SourceFunds
PCSRF$2,111
State$193,186
Other$223,083
In-Kind Other$22,800
Report Total:$441,180


Project Map



Worksites

20050463    


  • Worksite Identifier: 20050463
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Oregon Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 43.99201731
  • Longitude: -123.98406309

ESU

  • Lower Columbia River Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 151,981.00
    •      . . C.0.b Length of stream treated/protected 2.20
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Siuslaw Basin Watershed Assessment/2001/EcoTrust
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 104,698.00
      •      . . . . C.4.b Total length of instream habitat treated 2.20
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity 2.20
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .07
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 0
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement 2.20
        •      . . . . . . C.4.d.7 Number of structures placed in channel 0
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 14,446.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated 4.40
        •      . . . . C.5.b.2 Total Riparian Acres Treated 7.2
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Planted 970 trees, shrubs & wetland plants. Planting also included 3,000 willow stakes in outside bend of new channel prior to flow connection. Open soil seeded w/ native grass seed.
          •      . . . . . . C.5.c.3 Acres planted in riparian 7.2
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting 4.40
        •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
          •      . . . . C.6.a Upland Habitat / Sediment Funding 32,837.00
          •      . . . . C.6.b.1 Acres of upland habitat area treated .1
          •      . . . . C.6.b.2 Miles of road treated in upland area .01
          •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
            •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .01

20050464    


  • Worksite Identifier: 20050464
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Oregon Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 43.99212535
  • Longitude: -123.9835568

ESU

  • Lower Columbia River Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 116,287.00
    •      . . C.0.b Length of stream treated/protected 2.50
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Siuslaw Basin Watershed Assessment/2001/EcoTrust
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 87,623.00
      •      . . . . C.4.b Total length of instream habitat treated 2.50
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity 1.80
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .09
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 0
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement 2.50
        •      . . . . . . C.4.d.7 Number of structures placed in channel 0
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 28,664.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated 5.00
        •      . . . . C.5.b.2 Total Riparian Acres Treated 9.0
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Planted 1,880 trees, shrubs & wetland plants. Planting included 7,000 willow stakes in outside bends of new channel. Open soil was seeded w/ native annual grass seed after channel construction.
          •      . . . . . . C.5.c.3 Acres planted in riparian 9.0
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting 5.00

20050465    


  • Worksite Identifier: 20050465
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Oregon Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 43.98791337
  • Longitude: -123.97606846

ESU

  • Lower Columbia River Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 112,651.00
    •      . . C.0.b Length of stream treated/protected 2.50
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Siuslaw Basin Watershed Assessment/2001/EcoTrust
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 89,403.00
      •      . . . . C.4.b Total length of instream habitat treated 2.50
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity .00
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .03
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 0
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement 2.50
        •      . . . . . . C.4.d.7 Number of structures placed in channel 0
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 23,248.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated 5.00
        •      . . . . C.5.b.2 Total Riparian Acres Treated 16.0
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Planted 1,025 conifer trees
          •      . . . . . . C.5.c.3 Acres planted in riparian 16.0
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting 5.00

20050466    


  • Worksite Identifier: 20050466
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Oregon Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 43.98950807
  • Longitude: -123.97743718

ESU

  • Lower Columbia River Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 60,261.00
    •      . . C.0.b Length of stream treated/protected .50
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Siuslaw Basin Watershed Assessment/2001/Eco Trust
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 41,607.00
      •      . . . . C.4.b Total length of instream habitat treated .50
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity .00
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .01
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 0
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .50
        •      . . . . . . C.4.d.7 Number of structures placed in channel 58
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 18,654.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated 1.00
        •      . . . . C.5.b.2 Total Riparian Acres Treated 15.0
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Totals for planting this year included 319 shrubs, 356 hardwoods & 645 conifers, planted in both new areas (upper valley) & old areas where original plantings did not survive.
          •      . . . . . . C.5.c.3 Acres planted in riparian 15.0
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting 1.00