Coyote Bucket Off-stream Watering

Salmonid Habitat Restoration and Acquisition

Upland Habitat And Sediment
Project IDKLAMATH-2018-4
Recovery Domains -
Start Date01/01/2020
End Date09/30/2020
Year2018
StatusCompleted
Last Edited01/31/2024
 
1 - 1

Description    


An off-stream cattle watering facility was installed approximately one mile from the Sycan River. The landowner constructed a livestock watering well during 2019 and the Klamath Tribes contracted to install 2 cattle watering troughs, installed well pump, water shut-off valve, rock pads, and solar array to power the pump.

Project Benefit    


The landowner has already drilled a well for the project. PCSRF funds will be used to construct an off-stream watering facility including watering troughs, solar pump and solar panels. The off-stream water facility excludes cattle from entering the Sycan River for drinking.

Accomplishments

Metric Completed Originally
Proposed
Upland Habitat
  Acres Treated 10.0 10.0

Funding Details

SourceFunds
PCSRF$50,000
Report Total:$50,000


Project Map



Worksites

Coyote Bucket Lower Sycan River    


  • Worksite Identifier: Coyote Bucket Lower Sycan River
  • Start Date:
  • End Date:
Area Description
Lower Sycan River near Blue Creek

Location Information

  • Basin: Klamath (180102)
  • Subbasin: Sprague (18010202)
  • Watershed: Lower Sycan River (1801020206)
  • Subwatershed: Chester Spring-Sycan River (180102020606)
  • State: Oregon
  • Recovery Domain:
  • Latitude: 42.56049063947167
  • Longitude: -121.32449626922347

ESU

  • Upper Klamath / Trinity Rivers Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 50,000.00
    •      . . C.0.b Length of stream treated/protected 2.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      Post-installation monitoring to see if it was installed as designed.
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 50,000.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 10.0
      •      . . . . C.6.b.3 Cubic yards (to nearest yard) of sediment prevented from entering stream (Cubic yards)
      •      . . . . C.6.j.1 Upland livestock management Y (Y/N)
        •      . . . . . . C.6.j.2 Upland livestock management action(s) taken (LOV)
        •      . . . . . . C.6.j.3 Upland acres managed for livestock 1,000.0
        •      . . . . . . C.6.j.4 Number of livestock water installations/developments 1