Instream Flow Protection: Southeast - Phase 14_Gage
Salmonid Restoration Planning and Assessments
|
AK44373_GAGE | - | 07/01/2018 | 06/30/2019 | 2016 | Completed | 01/25/2024 | |
| |
Description
This project operated streamgages on Freshwater Creek, Eva Creek, Luck Creek, Control Creek, Davies Creek, Dangerous River, and the Italio River and took discharge measurements at stations located on North Fork Freshwater Creek, upstream of Freshwater Creek streamgage, Kennel Creek, upper Pavlof River, the inlet creek to Lake Eva, Cowee Creek upstream of Davies Creek, Eagle Creek, Ratz Creek, Log Jam Creek, and upper Luck Creek. The intended gage installation at Eagle River was abandoned for lack of a suitable site. Streamgage data will be used to develop reservation of water applications when sufficient data has been collected.
Project Benefit
The rivers of SE AK support some of North America’s most viable and productive salmon and steelhead populations, including many utilized for subsistence. Salmon and steelhead depend on sufficient quantities of water to meet their spawning, rearing, incubation, overwintering, and migration habitat requirements. This project will contribute to long-term habitat protection by gathering the necessary flow data to legally reserving instream flows needed to conserve salmon and steelhead populations.
Accomplishments
Planning and Assessment |
Stream Miles Assessed |
32.50 |
36.00 |
Funding Details |
PCSRF | $164,265 |
State | $59,043 |
Report Total: | $223,308 |
|
| |
Worksites
Windfall Creek
- Worksite Identifier: Windfall Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Northern Southeast Alaska (190103)
- Subbasin: Lynn Canal (19010301)
- Watershed: Herbert River-Eagle River (1901030105)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 58.509822
- Longitude: -134.735308
ESU
- Un-Named ESU Sockeye
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 17,808.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 17,808.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed .50
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions .50
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Eva Creek
- Worksite Identifier: Eva Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin: Baranof Island (19010212)
- Watershed: Saook Bay-Frontal Peril Strait (1901021204)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 57.405596
- Longitude: -135.085378
ESU
- Un-Named ESU Sockeye
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 25,500.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 25,500.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 1.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 1.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Eagle Creek
- Worksite Identifier: Eagle Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Southeast Alaska (190101)
- Subbasin: Prince of Wales (19010103)
- Watershed: Kashevarof Passage-Frontal Clarence Strait (1901010303)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 55.955225
- Longitude: -132.782339
ESU
- Un-Named ESU Sockeye
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 4,250.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 4,250.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 1.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 1.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Upper Luck Creek
- Worksite Identifier: Upper Luck Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Southeast Alaska (190101)
- Subbasin: Prince of Wales (19010103)
- Watershed: Kashevarof Passage-Frontal Clarence Strait (1901010303)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 55.907081
- Longitude: -132.782422
ESU
- Un-Named ESU Sockeye
- Un-Named ESU Coho
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 4,250.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 4,250.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 2.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 2.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Pavlof River
- Worksite Identifier: Pavlof River
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin: Chichagof Island (19010211)
- Watershed: Freshwater Bay-Frontal Chatham Strait (1901021102)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 57.846452
- Longitude: -135.162639
ESU
- Un-Named ESU Sockeye
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 4,500.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 4,500.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 2.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 2.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Kennel Creek
- Worksite Identifier: Kennel Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin: Chichagof Island (19010211)
- Watershed: Freshwater Bay-Frontal Chatham Strait (1901021102)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 57.888422
- Longitude: -135.166345
ESU
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 4,500.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 4,500.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 2.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 2.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
North Fork Freshwater Creek
- Worksite Identifier: North Fork Freshwater Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin: Chichagof Island (19010211)
- Watershed: Freshwater Bay-Frontal Chatham Strait (1901021102)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 57.954589
- Longitude: -135.289882
ESU
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 4,500.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 4,500.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 2.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 2.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Freshwater Creek above gage
- Worksite Identifier: Freshwater Creek above gage
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin: Chichagof Island (19010211)
- Watershed: Freshwater Bay-Frontal Chatham Strait (1901021102)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 57.93454
- Longitude: -135.249501
ESU
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 4,500.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 4,500.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 2.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 2.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Lake Eva
- Worksite Identifier: Lake Eva
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin: Baranof Island (19010212)
- Watershed: Saook Bay-Frontal Peril Strait (1901021204)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 57.392301
- Longitude: -135.118138
ESU
- Un-Named ESU Sockeye
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 9,000.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 9,000.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 2.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 2.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Italio River
- Worksite Identifier: Italio River
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Gulf of Alaska (190104)
- Subbasin: Yakutat Bay-Gulf of Alaska (19010405)
- Watershed: Akwe River-Italio River (1901040520)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 59.301903
- Longitude: -139.055833
ESU
- Un-Named ESU Sockeye
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 30,000.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 30,000.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 3.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 3.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Dangerous River
- Worksite Identifier: Dangerous River
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Gulf of Alaska (190104)
- Subbasin: Yakutat Bay-Gulf of Alaska (19010405)
- Watershed: Yakutat Glacier-Dangerous River (1901040519)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 59.417067
- Longitude: -139.024333
ESU
- Un-Named ESU Sockeye
- Un-Named ESU Coho
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 32,000.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 32,000.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 3.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 3.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Ratz Creek
- Worksite Identifier: Ratz Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Southeast Alaska (190101)
- Subbasin: Prince of Wales (19010103)
- Watershed: Kashevarof Passage-Frontal Clarence Strait (1901010303)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 55.886526
- Longitude: -132.636123
ESU
- Un-Named ESU Sockeye
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 3,750.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 3,750.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 2.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 2.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Logjam Creek
- Worksite Identifier: Logjam Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Southeast Alaska (190101)
- Subbasin: Prince of Wales (19010103)
- Watershed: Logjam Creek (1901010301)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 55.905517
- Longitude: -133.007972
ESU
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 3,750.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 3,750.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 3.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 3.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Control Creek
- Worksite Identifier: Control Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Southeast Alaska (190101)
- Subbasin: Prince of Wales (19010103)
- Watershed: Thorne River (1901010302)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 55.7000055
- Longitude: -132.849136
ESU
- Un-Named ESU Sockeye
- Un-Named ESU Coho
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 17,500.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 17,500.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 1.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 1.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Luck Creek
- Worksite Identifier: Luck Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Southeast Alaska (190101)
- Subbasin: Prince of Wales (19010103)
- Watershed: Kashevarof Passage-Frontal Clarence Strait (1901010303)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 55.921664
- Longitude: -132.765246
ESU
- Un-Named ESU Sockeye
- Un-Named ESU Coho
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 17,500.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 17,500.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 2.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 2.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Davies Creek
- Worksite Identifier: Davies Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Northern Southeast Alaska (190103)
- Subbasin: Lynn Canal (19010301)
- Watershed: Berners Bay-Frontal Lynn Canal (1901030104)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 58.655897
- Longitude: -134.879484
ESU
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 17,500.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 17,500.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 3.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 3.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Eagle River
- Worksite Identifier: Eagle River
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Northern Southeast Alaska (190103)
- Subbasin: Lynn Canal (19010301)
- Watershed: Herbert River-Eagle River (1901030105)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 58.528252
- Longitude: -134.805518
ESU
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding .00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding .00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed .00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions .00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
Freshwater Creek
- Worksite Identifier: Freshwater Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin: Chichagof Island (19010211)
- Watershed: Freshwater Bay-Frontal Chatham Strait (1901021102)
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 57.934109
- Longitude: -135.247923
ESU
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 22,500.00
- . . B.0.b.1
Area Encompassed .0
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 22,500.00
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed 1.00
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids .00
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration .00
- . . . . . . B.2.c.5
Stream miles assessed for regulatory actions 1.00
- . . . . . . B.2.c.6
Fish passage impediments identified 0
|
|