Fish Passage Improvement at Crossing 9, Quiota Creek
Salmonid Habitat Restoration and Acquisition
|
725521 | S. California - S. Central CA Coast | 06/01/2018 | 04/18/2019 | 2017 | Completed | 01/25/2024 | |
| |
Description
The ninth concrete low-flow (Arizona) crossing and degraded culvert on South Refugio Road, Santa Barbara County, was replaced with a 60-foot bottomless-arched culvert so that Quiota Creek has un-obstructed streamflow. The project also included the installation of two at grade rock weirs below the bridge to simulate natural stream geometry in this reach. Additionally, 16 coast live oaks (6 extra), 30 sycamores, and 5 Laurel bays were planted as mitigation for the five trees removed. Willow stakes and hydromulch were added to replace emergent vegetation.
Project Benefit
Replacing the culvert with a bridge will provide access to 2.73 miles of salmonid habitat.
Accomplishments
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
2.73 |
2.73 |
Funding Details |
PCSRF | $993,121 |
In-Kind Other | $217,852 |
Report Total: | $1,210,973 |
|
| |
Worksites
7211125
- Worksite Identifier: 7211125
- Start Date:
- End Date:
Area Description
Quiota Creek Crossing #9
Location Information
- Basin: Central California Coastal (180600)
- Subbasin: Santa Ynez (18060010)
- Watershed: Alamo Pintado Creek-Santa Ynez River (1806001005)
- Subwatershed: Alisal Creek-Santa Ynez River (180600100508)
- State: California
- Recovery Domain: S. California - S. Central CA Coast
- Latitude: 34.55477
- Longitude: -120.08171
ESU
- Southern California Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 1,210,973.00
- . . C.0.b
Length of stream treated/protected .40
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 1,210,973.00
- . . . . C.2.b.1
Length of stream made accessible 2.73
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded 1
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade 2.73
|
|