Fish Passage Improvement at Crossing 9, Quiota Creek

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement
Project ID725521
Recovery DomainsS. California - S. Central CA Coast
Start Date06/01/2018
End Date04/18/2019
Year2017
StatusCompleted
Last Edited01/25/2024
 
1 - 1

Description    


The ninth concrete low-flow (Arizona) crossing and degraded culvert on South Refugio Road, Santa Barbara County, was replaced with a 60-foot bottomless-arched culvert so that Quiota Creek has un-obstructed streamflow. The project also included the installation of two at grade rock weirs below the bridge to simulate natural stream geometry in this reach. Additionally, 16 coast live oaks (6 extra), 30 sycamores, and 5 Laurel bays were planted as mitigation for the five trees removed. Willow stakes and hydromulch were added to replace emergent vegetation.

Project Benefit    


Replacing the culvert with a bridge will provide access to 2.73 miles of salmonid habitat.

Accomplishments

Metric Completed Originally
Proposed
Fish Passage
  Barriers Removed
  Miles Opened 2.73 2.73

Funding Details

SourceFunds
PCSRF$993,121
In-Kind Other$217,852
Report Total:$1,210,973


Project Map



Worksites

7211125    


  • Worksite Identifier: 7211125
  • Start Date:
  • End Date:
Area Description
Quiota Creek Crossing #9

Location Information

  • Basin: Central California Coastal (180600)
  • Subbasin: Santa Ynez (18060010)
  • Watershed: Alamo Pintado Creek-Santa Ynez River (1806001005)
  • Subwatershed: Alisal Creek-Santa Ynez River (180600100508)
  • State: California
  • Recovery Domain: S. California - S. Central CA Coast
  • Latitude: 34.55477
  • Longitude: -120.08171

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 1,210,973.00
    •      . . C.0.b Length of stream treated/protected .40
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 1,210,973.00
      •      . . . . C.2.b.1 Length of stream made accessible 2.73
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1