Rockpile Creek Sediment Reduction & Instream Barrier Removal
Salmonid Habitat Restoration and Acquisition
|
725505 | N Central California Coast | 06/01/2018 | 01/15/2019 | 2017 | Completed | 01/25/2024 | |
| |
Description
All work completed as proposed. Work was completed on time, however a two year timeline planned for reassurance. Large debris accumulation (LDA) modified for fish passage, road decommissioned with 6 crossings removed, and 1 culvert upgraded.
Project Benefit
Decommissioning roads will reduce sedimentation into the stream and improve water quality.
Accomplishments
Upland Habitat |
Acres Treated |
3.0 |
2.0 |
Fish Passage |
Barriers Removed |
1 |
1 |
Miles Opened |
.83 |
.83 |
Funding Details |
State | $35,541 |
In-Kind Other | $25,983 |
Report Total: | $61,524 |
|
| |
Worksites
7211106
- Worksite Identifier: 7211106
- Start Date:
- End Date:
Area Description
Project Site 1
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin: Gualala-Salmon (18010109)
- Watershed: Gualala River (1801010901)
- Subwatershed: Rockpile Creek (180101090106)
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 38.787649
- Longitude: -123.381209
ESU
- California Coastal Chinook Salmon ESU
- Central California Coast Coho Salmon ESU
- Northern California Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 61,524.00
- . . C.0.b
Length of stream treated/protected .25
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
CDFW, 2004, Recovery Strategy for California Coho Salmon, DFW Fortuna, Fortuna, CA 95540 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 30,762.00
- . . . . C.2.b.1
Length of stream made accessible .83
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.c.1
Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
- . . . . . . C.2.c.2
Number of blockages/impediments/barriers removed/altered 1
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 30,762.00
- . . . . C.6.b.1
Acres of upland habitat area treated 3.0
- . . . . C.6.b.2
Miles of road treated in upland area .74
- . . . . C.6.c.1
Road drainage system improvements and reconstructionY (Y/N)
- . . . . . . C.6.c.2
Miles of road treated for drainage system improvements and reconstruction .25
- . . . . C.6.d.1
Road closure / abandonmentY (Y/N)
- . . . . . . C.6.d.2
Miles of road closed / abandoned .49
|
|