Stream Bank Restoration: Mat-Su Cost Share – Phase 4
Salmonid Habitat Restoration and Acquisition
|
AK51006 | - | 03/01/2018 | 01/31/2021 | 2017 | Completed | 05/08/2024 | |
| |
Description
From 2018 through 2020, staff received letters of interest from 41 private landowners and public land managers. From those proposals, this project helped fund 10 shoreline vegetation and protection projects. At seven sites, structures detrimental to juvenile salmon were removed from the riparian area (including cinder blocks, sand bags, dock structures, creosol wood, rock, metal, and wood debris); at 9 sites, streambanks were stabilized utilizing: brush layering (8 sites), trenched willows (1 site), and spruce tree revetments (1 site); at 4 sites, fencing was installed to protect riparian habitat; at 5 sites, light-penetrating gratewalks and stairs were installed to direct foot traffic and protect riparian habitat (riparian exclusion); and at all 10 sites riparian habitat was revegetated using native vegetated mat (9 sites), potted native alders (2 sites), paper birch (1 site), native riparian seed mix (1 site), and blue joint grass (1 site).
Project Benefit
This project will result in the removal of detrimental structures from streams and the conservation and rehabilitation of riverbank, which together will help conserve and restore healthy salmon habitat and healthy salmon populations. It will also demonstrate to local residents, governmental agencies, and regulators the benefits of bio-engineered alternatives to the traditional use of riprap, concrete slabs, sheet pile, and wooden bulkheads for bank stabilization.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.16 |
.40 |
Riparian Habitat |
Stream Miles Treated |
.13 |
.40 |
Acres Treated |
1.0 |
.0 |
Funding Details |
PCSRF | $208,391 |
State | $47,514 |
Other | $87,428 |
Report Total: | $343,333 |
|
| |
Worksites
201830
- Worksite Identifier: 201830
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Susitna River (190205)
- Subbasin: Lower Susitna River (19020505)
- Watershed: Little Susitna River (1902050512)
- Subwatershed: Lake Creek (190205051205)
- State: Alaska
- Recovery Domain:
- Latitude: 61.683591
- Longitude: -150.002337
ESU
- Un-Named ESU Chinook
- Un-Named ESU Coho
- Un-Named ESU Sockeye
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 37,667.00
- . . C.0.b
Length of stream treated/protected .02
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 23,973.00
- . . . . C.4.b
Total length of instream habitat treated .02
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .02
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 13,694.00
- . . . . C.5.b.1
Total riparian miles streambank treated .01
- . . . . C.5.b.2
Total Riparian Acres Treated .1
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Local vegetative mat (species vary) |
- . . . . . . C.5.c.3
Acres planted in riparian .1
- . . . . C.5.e.1
Riparian exclusionY (Y/N)
- . . . . . . C.5.e.3
Miles of riparian streambank protected by exclusion other than fencing .01
201942
- Worksite Identifier: 201942
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Susitna River (190205)
- Subbasin: Lower Susitna River (19020505)
- Watershed: Trapper Creek-Susitna River (1902050503)
- Subwatershed: Sheep Creek Slough-Susitna River (190205050308)
- State: Alaska
- Recovery Domain:
- Latitude: 61.971458
- Longitude: -150.084969
ESU
- Un-Named ESU Chinook
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Sockeye
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 25,826.00
- . . C.0.b
Length of stream treated/protected .04
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 16,029.00
- . . . . C.4.b
Total length of instream habitat treated .02
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .02
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 9,797.00
- . . . . C.5.b.1
Total riparian miles streambank treated .04
- . . . . C.5.b.2
Total Riparian Acres Treated .1
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Local vegetative mat (species vary) |
- . . . . . . C.5.c.3
Acres planted in riparian .1
- . . . . C.5.d.1
FencingY (Y/N)
- . . . . . . C.5.d.2
Miles of fence along stream .04
- . . . . C.5.e.1
Riparian exclusionY (Y/N)
- . . . . . . C.5.e.3
Miles of riparian streambank protected by exclusion other than fencing .01
201943
- Worksite Identifier: 201943
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Susitna River (190205)
- Subbasin: Lower Susitna River (19020505)
- Watershed: Little Susitna River (1902050512)
- Subwatershed: Lake Creek (190205051205)
- State: Alaska
- Recovery Domain:
- Latitude: 61.683591
- Longitude: -150.002337
ESU
- Un-Named ESU Chinook
- Un-Named ESU Coho
- Un-Named ESU Sockeye
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 53,863.00
- . . C.0.b
Length of stream treated/protected .04
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 33,532.00
- . . . . C.4.b
Total length of instream habitat treated .04
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .04
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 20,331.00
- . . . . C.5.b.1
Total riparian miles streambank treated .01
- . . . . C.5.b.2
Total Riparian Acres Treated .1
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Local vegetative mat (species vary) |
- . . . . . . C.5.c.3
Acres planted in riparian .1
- . . . . C.5.e.1
Riparian exclusionY (Y/N)
- . . . . . . C.5.e.3
Miles of riparian streambank protected by exclusion other than fencing .01
- . . . . C.5.j.1
Debris/structures removalY (Y/N)
- . . . . . . C.5.j.2
Acres of riparian treated for debris/structures removal .1
201944
- Worksite Identifier: 201944
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Knik Arm (190204)
- Subbasin: Anchorage (19020401)
- Watershed: Fish Creek (1902040105)
- Subwatershed: Meadow Creek (190204010502)
- State: Alaska
- Recovery Domain:
- Latitude: 61.58407
- Longitude: -149.83295
ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 39,447.00
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 29,585.00
- . . . . C.4.b
Total length of instream habitat treated .01
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .01
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 9,862.00
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated .1
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Local vegetative mat (species vary) |
- . . . . . . C.5.c.3
Acres planted in riparian .1
202046
- Worksite Identifier: 202046
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Knik Arm (190204)
- Subbasin: Anchorage (19020401)
- Watershed: Fish Creek (1902040105)
- Subwatershed: Meadow Creek (190204010502)
- State: Alaska
- Recovery Domain:
- Latitude: 61.58407
- Longitude: -149.83295
ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 42,983.00
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 14,326.00
- . . . . C.4.b
Total length of instream habitat treated .01
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .01
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 28,657.00
- . . . . C.5.b.1
Total riparian miles streambank treated .01
- . . . . C.5.b.2
Total Riparian Acres Treated .1
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Local vegetative mat (species vary); Alnus sinuata; native seeds |
- . . . . . . C.5.c.3
Acres planted in riparian .1
- . . . . C.5.e.1
Riparian exclusionY (Y/N)
- . . . . . . C.5.e.3
Miles of riparian streambank protected by exclusion other than fencing .01
- . . . . C.5.j.1
Debris/structures removalY (Y/N)
- . . . . . . C.5.j.2
Acres of riparian treated for debris/structures removal .1
202048
- Worksite Identifier: 202048
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Knik Arm (190204)
- Subbasin: Anchorage (19020401)
- Watershed: Fish Creek (1902040105)
- Subwatershed: Big Lake (190204010503)
- State: Alaska
- Recovery Domain:
- Latitude: 61.517307
- Longitude: -149.916528
ESU
- Un-Named ESU Chinook
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Sockeye
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 38,880.00
- . . C.0.b
Length of stream treated/protected .02
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 12,959.00
- . . . . C.4.b
Total length of instream habitat treated .02
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .02
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 25,921.00
- . . . . C.5.b.1
Total riparian miles streambank treated .01
- . . . . C.5.b.2
Total Riparian Acres Treated .1
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Local vegetative mat (species vary) |
- . . . . . . C.5.c.3
Acres planted in riparian .1
- . . . . C.5.e.1
Riparian exclusionY (Y/N)
- . . . . . . C.5.e.3
Miles of riparian streambank protected by exclusion other than fencing .01
- . . . . C.5.j.1
Debris/structures removalY (Y/N)
- . . . . . . C.5.j.2
Acres of riparian treated for debris/structures removal .1
202045
- Worksite Identifier: 202045
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Susitna River (190205)
- Subbasin: Lower Susitna River (19020505)
- Watershed: Trapper Creek-Susitna River (1902050503)
- Subwatershed: Twister Creek-Susitna River (190205050305)
- State: Alaska
- Recovery Domain:
- Latitude: 62.315124
- Longitude: -150.110079
ESU
- Un-Named ESU Chinook
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Sockeye
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 19,062.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 19,062.00
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated .1
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Alnus sinuata; Betula papyrifera |
- . . . . . . C.5.c.3
Acres planted in riparian .1
- . . . . C.5.j.1
Debris/structures removalY (Y/N)
- . . . . . . C.5.j.2
Acres of riparian treated for debris/structures removal .1
202050
- Worksite Identifier: 202050
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Susitna River (190205)
- Subbasin: Lower Susitna River (19020505)
- Watershed: Trapper Creek-Susitna River (1902050503)
- Subwatershed: Sheep Creek Slough-Susitna River (190205050308)
- State: Alaska
- Recovery Domain:
- Latitude: 61.971138
- Longitude: -150.085165
ESU
- Un-Named ESU Chinook
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Sockeye
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 34,296.00
- . . C.0.b
Length of stream treated/protected .02
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 22,865.00
- . . . . C.4.b
Total length of instream habitat treated .01
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .01
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 11,431.00
- . . . . C.5.b.1
Total riparian miles streambank treated .02
- . . . . C.5.b.2
Total Riparian Acres Treated .1
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Local vegetative mat (species vary) |
- . . . . . . C.5.c.3
Acres planted in riparian .1
- . . . . C.5.d.1
FencingY (Y/N)
- . . . . . . C.5.d.2
Miles of fence along stream .02
- . . . . C.5.j.1
Debris/structures removalY (Y/N)
- . . . . . . C.5.j.2
Acres of riparian treated for debris/structures removal .1
202049
- Worksite Identifier: 202049
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Knik Arm (190204)
- Subbasin: Anchorage (19020401)
- Watershed: City of Anchorage-Frontal Cook Inlet (1902040108)
- Subwatershed: Wasilla Creek (190204010802)
- State: Alaska
- Recovery Domain:
- Latitude: 61.549183
- Longitude: -149.291368
ESU
- Un-Named ESU Chinook
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Sockeye
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 23,696.00
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 8,294.00
- . . . . C.4.b
Total length of instream habitat treated .01
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .01
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 15,402.00
- . . . . C.5.b.1
Total riparian miles streambank treated .01
- . . . . C.5.b.2
Total Riparian Acres Treated .1
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Local vegetative mat (species vary); Calamagrostis canadensis |
- . . . . . . C.5.c.3
Acres planted in riparian .1
- . . . . C.5.d.1
FencingY (Y/N)
- . . . . . . C.5.d.2
Miles of fence along stream .01
201836
- Worksite Identifier: 201836
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Susitna River (190205)
- Subbasin: Lower Susitna River (19020505)
- Watershed: Fish Creek-Susitna River (1902050510)
- Subwatershed: Delta Islands-Susitna River (190205051002)
- State: Alaska
- Recovery Domain:
- Latitude: 61.7777
- Longitude: -150.166
ESU
- Un-Named ESU Chinook
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Sockeye
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 27,613.00
- . . C.0.b
Length of stream treated/protected .02
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
ADF&G Strategic Plan 2015-2020 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 20,710.00
- . . . . C.4.b
Total length of instream habitat treated .02
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .02
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 6,903.00
- . . . . C.5.b.1
Total riparian miles streambank treated .02
- . . . . C.5.b.2
Total Riparian Acres Treated .1
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Local vegetative mat (species vary) |
- . . . . . . C.5.c.3
Acres planted in riparian .1
- . . . . C.5.d.1
FencingY (Y/N)
- . . . . . . C.5.d.2
Miles of fence along stream .02
- . . . . . . C.5.d.3
Acres of riparian area protected by fencing .1
- . . . . C.5.j.1
Debris/structures removalY (Y/N)
|
|