Dennett Dam Removal Phase 2: Project Design
Salmonid Restoration Planning and Assessments
|
| 724625 | | Central Valley | | 06/01/2015 | | 10/24/2016 | | 2014 | | Completed | | 01/14/2025 | | |
| |
Description
The project produced Final Engineering Design drawings (100%), Specification, and Cost Estimates to remove Dennett Dam on the Tuolumne River. As part of the project 30%, 65%, and 90% level engineering design drawings were completed. A Mitigated Negative Declaration, Mitigation Monitoring Plan, and a CEQA Notice of Determination was also completed under the project, as were all permit application package.
Project Benefit
Develop a final design which will result in removal of the dam and restore channel and riparian function in the Tuolumne River in the Dennet Dam area.
Funding Details |
| State | $93,764 |
| Other | $132,093 |
| Report Total: | $225,857 |
|
| |
Worksites
7210948
- Worksite Identifier: 7210948
- Start Date:
- End Date:
Area Description
Dennett Dam
Location Information
- Basin: San Joaquin (180400)
- Subbasin: Upper Tuolumne (18040009)
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: Central Valley
- Latitude: 37.627399
- Longitude: -120.987631
ESU
- California Central Valley Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 477,101.00
- . . B.0.b.1
Area Encompassed .5
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 225,857.00
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
| Name of plan implemented | |
| National Marine Fisheries Service, 2014. Recovery Plan forCouth- Central Calif Coast Steelhead |
- . . . . . . B.1.b.11.b
| Description and scope of the plan implemented | |
| Implement projects to minimize predation at weirs, diversion dams, and related structures in the Tuolumne River. |
|
|