Leo Carrillo State Park, Arroyo Sequit Steelhead Trout Barrier Removal

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement
Project ID724622
Recovery DomainsS. California - S. Central CA Coast
Start Date05/01/2015
End Date03/29/2017
Year2014
StatusCompleted
Last Edited01/25/2024
 
1 - 1

Description    


2 freespan bridges were placed where 2 diversion dams were removed which reconnected 4.5 miles of creek and restored 1300sf of riparian habitat (12 acres).

Project Benefit    


Restore rearing and spawning habitat for steelhead.

Accomplishments

Metric Completed Originally
Proposed
Fish Passage
  Barriers Removed 4 4
  Miles Opened 23.00 23.00

Funding Details

SourceFunds
State$400,000
Report Total:$400,000


Project Map



Worksites

7211055    


  • Worksite Identifier: 7211055
  • Start Date:
  • End Date:
Area Description
Arroyo Sequit Creek Upper Barrier

Location Information

  • Basin: Ventura-San Gabriel Coastal (180701)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: S. California - S. Central CA Coast
  • Latitude: 34.05551
  • Longitude: -118.93401

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 400,000.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Santa Monica Bay Restoration Commission, 2008, Santa Monica Bay Restoration Plan, Bay Restoration Foundation, Los Angeles, CA
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 200,000.00
      •      . . . . C.2.b.1 Length of stream made accessible 11.50
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.c.1 Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
        •      . . . . . . C.2.c.2 Number of blockages/impediments/barriers removed/altered 1
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade 4.50

7211056    


  • Worksite Identifier: 7211056
  • Start Date:
  • End Date:
Area Description
Arroyo Sequit Creek Lower Barrier

Location Information

  • Basin: Ventura-San Gabriel Coastal (180701)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: S. California - S. Central CA Coast
  • Latitude: 34.04649
  • Longitude: -118.93381

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 400,000.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Santa Monica Bay Restoration Commission, 2008, Santa Monica Bay Restoration Plan, Bay Restoration Foundation, Los Angeles, CA
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 200,000.00
      •      . . . . C.2.b.1 Length of stream made accessible 11.50
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 2
      •      . . . . C.2.c.1 Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
        •      . . . . . . C.2.c.2 Number of blockages/impediments/barriers removed/altered 3
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade 4.50