Leo Carrillo State Park, Arroyo Sequit Steelhead Trout Barrier Removal
Salmonid Habitat Restoration and Acquisition
|
724622 | S. California - S. Central CA Coast | 05/01/2015 | 03/29/2017 | 2014 | Completed | 01/25/2024 | |
| |
Description
2 freespan bridges were placed where 2 diversion dams were removed which reconnected 4.5 miles of creek and restored 1300sf of riparian habitat (12 acres).
Project Benefit
Restore rearing and spawning habitat for steelhead.
Accomplishments
Fish Passage |
Barriers Removed |
4 |
4 |
Miles Opened |
23.00 |
23.00 |
Funding Details |
State | $400,000 |
Report Total: | $400,000 |
|
| |
Worksites
7211055
- Worksite Identifier: 7211055
- Start Date:
- End Date:
Area Description
Arroyo Sequit Creek Upper Barrier
Location Information
- Basin: Ventura-San Gabriel Coastal (180701)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: S. California - S. Central CA Coast
- Latitude: 34.05551
- Longitude: -118.93401
ESU
- Southern California Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 400,000.00
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Santa Monica Bay Restoration Commission, 2008, Santa Monica Bay Restoration Plan, Bay Restoration Foundation, Los Angeles, CA |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 200,000.00
- . . . . C.2.b.1
Length of stream made accessible 11.50
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.c.1
Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
- . . . . . . C.2.c.2
Number of blockages/impediments/barriers removed/altered 1
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded 1
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade 4.50
7211056
- Worksite Identifier: 7211056
- Start Date:
- End Date:
Area Description
Arroyo Sequit Creek Lower Barrier
Location Information
- Basin: Ventura-San Gabriel Coastal (180701)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: S. California - S. Central CA Coast
- Latitude: 34.04649
- Longitude: -118.93381
ESU
- Southern California Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 400,000.00
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Santa Monica Bay Restoration Commission, 2008, Santa Monica Bay Restoration Plan, Bay Restoration Foundation, Los Angeles, CA |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 200,000.00
- . . . . C.2.b.1
Length of stream made accessible 11.50
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 2
- . . . . C.2.c.1
Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
- . . . . . . C.2.c.2
Number of blockages/impediments/barriers removed/altered 3
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded 1
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade 4.50
|
|