Instream Flow Protection: Southeast – Phase 12

Salmonid Habitat Restoration and Acquisition

Instream Flow
Project ID44171_ROW
Recovery Domains -
Start Date12/01/2016
End Date06/30/2017
Year2014
StatusCompleted
Last Edited01/25/2024
 
1 - 1

Description    


Reservation of water applications were completed and filed with the Alaska Department of Natural Resources (DNR) for Ella Creek, Grace Creek, Klahini River, Red River, and the Blossom River.

Project Benefit    


The rivers of SE AK support some of North America’s most viable and productive salmon and steelhead fisheries. Salmon and steelhead depend on sufficient quantities of water to meet their spawning, rearing, incubation, overwintering, and migration habitat requirements. This project will benefit salmon and steelhead populations (including those used for important subsistence fisheries) throughout SE AK by legally reserving water needed to sustain their production.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$25,000
State$7,500
Report Total:$32,500


Project Map



Worksites

Red River    


  • Worksite Identifier: Red River
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 55.131184929227864
  • Longitude: -130.57092231445048

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,500.00
    •      . . C.0.b Length of stream treated/protected .80
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 6,500.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow .80
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year577 (cfs)

Klehini River    


  • Worksite Identifier: Klehini River
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 56.0541666
  • Longitude: -131.0486111

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,500.00
    •      . . C.0.b Length of stream treated/protected 2.60
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 6,500.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 2.60
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year536 (cfs)

Grace Creek    


  • Worksite Identifier: Grace Creek
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 55.65777
  • Longitude: -130.97055

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,500.00
    •      . . C.0.b Length of stream treated/protected 1.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 6,500.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 1.00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year418 (cfs)

Blossum River    


  • Worksite Identifier: Blossum River
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 55.426111
  • Longitude: -130.561

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,500.00
    •      . . C.0.b Length of stream treated/protected 5.50
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 6,500.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 5.50
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year63 (cfs)

Ella Creek    


  • Worksite Identifier: Ella Creek
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 55.505088
  • Longitude: -131.026733

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,500.00
    •      . . C.0.b Length of stream treated/protected 1.10
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 6,500.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 1.10
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year244 (cfs)