East Fork Ryan Creek Sediment Reduction and Habitat Enhancement Project
Salmonid Habitat Restoration and Acquisition
|
724794 | N Central California Coast | 06/01/2016 | 04/03/2018 | 2015 | Completed | 01/25/2024 | |
| |
Description
All of the following work was conducted along a 0.85 miles stretch of the R-16 road. 0.56 miles decommissioned in 2016, including stream crossing and landslide sites. 4,772 cubic yards of sediment were prevented from entering the stream. In 2017, 0.29 miles of road were decommissioned, including 7 stream crossings and 1 landslide site - saving 3,224 cubic yards of sediment from the stream.
A total of 0.85 miles of road were decommissioned, including 25 sediment elivery features, 18 stream crossings, and 7 potential fillslope failures. This will prevent 8,000 cubic yards of material from being delivered into East Fork Ryan Creek.
Project Benefit
Prescribed remedial treatments will prevent fill failures, stream crossing washouts and stream diversions. As a result, further degradation of water quality and salmonid habitat in the East Fork Ryan Creek watershed will be reduced.
Accomplishments
Upland Habitat |
Acres Treated |
3.1 |
3.4 |
Funding Details |
PCSRF | $346,134 |
Report Total: | $346,134 |
|
| |
Worksites
7211007
- Worksite Identifier: 7211007
- Start Date:
- End Date:
Area Description
EFRyan Creek
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 40.7311849
- Longitude: -124.1034248
ESU
- Central California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 740,647.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
California Department of Fish and Game, 2004, Recovery Strategy for California Coho Salmon
, California Department of Fish and Game, Sacramento, CA |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 346,134.00
- . . . . C.6.b.1
Acres of upland habitat area treated 3.1
- . . . . C.6.b.2
Miles of road treated in upland area .85
- . . . . C.6.d.1
Road closure / abandonmentY (Y/N)
- . . . . . . C.6.d.2
Miles of road closed / abandoned .85
|
|