Southwest Prince of Wales Stream Habitat Mapping - Phase 4

Salmonid Restoration Planning and Assessments

Salmonid Habitat Assessment / Inventory
Project IDAK44819
Recovery Domains -
Start Date03/01/2016
End Date02/28/2017
Year2012
StatusCompleted
Last Edited01/25/2024
 
1 - 1

Description    


Stream habitat and fish distribution data for Northeast Sukkwan Island and North Kasook Inlet were collected during the summer and fall field season in 2016 and the spring of 2017. These final surveyed watersheds and dates were a result of an approved amendment in March of 2017 that resulted in an extension to complete stream habitat mapping and anadromous waters sampling on North Kasook Inlet in May of 2017, and the substituting of streams in Hasiah Bay for Rose Creek and upper Dunbar, also in May of 2017. However, when surveyed by boat to assess potential streams, none in Hasiah Bay appeared suitable for salmon, so no Hasiah Bay streams were ultimately surveyed. Utilizing the Alaska Department of Fish and Game (ADF&G) Sport Fish Region V Stream Habitat Survey User Guide protocols, the locally hired field crew mapped and classified stream habitat and conducted anadromous fish surveys for approximately 4.5 miles of stream channel in the remaining watersheds, making over 280 fish observations and assessing potential fish passage barriers. The results of the fish distribution information collected resulted in three Anadromous Waters Catalog nominations, all on Northeast Sukkwan Islsnd. These nominations represent 2.5 miles of stream not previously included in the Anadromous Waters Catalog.

Project Benefit    


Northeast Sukkwan, Dunbar Inlet, North Kasook Inlet Lake, and Rose Creek watersheds support important subsistence salmon fisheries for the Haida people and the community of Hydaburg. This project will provide legal protection for approximately 10.7 kilometers of habitat in these watersheds through listing in Alaska’s Catalog of Waters Important for the Spawning, Rearing or Migration of Anadromous Fishes and provide baseline habitat information.

Accomplishments

Metric Completed Originally
Proposed
Planning and Assessment
  Stream Miles Assessed 4.50 7.60

Funding Details

SourceFunds
PCSRF$21,093
Other$10,229
Report Total:$31,322


Project Map



Worksites

Northeast Sukkwan    


  • Worksite Identifier: Northeast Sukkwan
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 55.172
  • Longitude: -132.829

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 15,799.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 15,799.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed 4.00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids 4.00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions 2.50
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Dunbar Inlet    


  • Worksite Identifier: Dunbar Inlet
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 55.119
  • Longitude: -132.829

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding .00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed .00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions .00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

North Kasook Inlet Lake    


  • Worksite Identifier: North Kasook Inlet Lake
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 55.049
  • Longitude: -132.799

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 15,523.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding 15,523.00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed .50
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions .00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0

Rose Inlet Creek    


  • Worksite Identifier: Rose Inlet Creek
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 54.95694
  • Longitude: -132.823

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
      •      . . . . B.2.a Habitat Assessment Funding .00
      •      . . . . B.2.c Instream SurveyY (Y/N)
        •      . . . . . . B.2.c.1 Type of instream survey (LOV)
        •      . . . . . . B.2.c.2 Stream miles assessed .00
        •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids .00
        •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration .00
        •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions .00
        •      . . . . . . B.2.c.6 Fish passage impediments identified 0