Gustavus Fish Passage Improvement

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement
Project IDAK44163
Recovery Domains -
Start Date03/15/2015
End Date09/30/2016
Year2014
StatusCompleted
Last Edited01/25/2024
 
1 - 1

Description    


PCSRF funds were used to remove the most upstream barrier culvert of five barrier culverts on Mountain View Drainage, a spring-fed stream supporting chum, pink, and coho salmon in Gustavus, Alaska. The culvert crossing was replaced with a bridge in August 2015 allowing for the restoration of natural channel morphology as well as natural flow, debris, and sediment conveyance. Fish now have unimpeded access under the crossing to 4.8 km of high quality spawning, rearing, and overwintering habitat upstream of the project site. Four downstream culverts have also been replaced with bridges using non-PCSRF funding.

Project Benefit    


This project will remove five barrier culverts that block or impede access to 4.8 km of spawning and rearing habitat for coho and pink salmon. With replacement of all five barriers, juvenile and adult salmon will have unimpeded access to the entire Mountain Meadow Drainage.

Accomplishments

Metric Completed Originally
Proposed
Fish Passage
  Barriers Removed
  Miles Opened 4.22 4.22

Funding Details

SourceFunds
PCSRF$130,134
Other$768,327
Report Total:$898,461


Project Map



Worksites

Tong Road    


  • Worksite Identifier: Tong Road
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Southeast Alaska (190103)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 58.427206
  • Longitude: -135.758656

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 143,959.00
    •      . . C.0.b Length of stream treated/protected .05
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Southeast Alaska Fish Habitat Partnership Strategic Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 143,959.00
      •      . . . . C.2.b.1 Length of stream made accessible 3.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade 3.00

Chase Driveway    


  • Worksite Identifier: Chase Driveway
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Southeast Alaska (190103)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 58.425168
  • Longitude: -135.757973

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 160,761.00
    •      . . C.0.b Length of stream treated/protected .05
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 160,761.00
      •      . . . . C.2.b.1 Length of stream made accessible .14
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade .14

Lukes Driveway    


  • Worksite Identifier: Lukes Driveway
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Southeast Alaska (190103)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 58.413943
  • Longitude: -135.755659

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 173,961.00
    •      . . C.0.b Length of stream treated/protected .05
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 173,961.00
      •      . . . . C.2.b.1 Length of stream made accessible .66
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade .66

Good River Road    


  • Worksite Identifier: Good River Road
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Southeast Alaska (190103)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 58.412732
  • Longitude: -135.761773

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 249,294.00
    •      . . C.0.b Length of stream treated/protected .05
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 249,294.00
      •      . . . . C.2.b.1 Length of stream made accessible .30
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade .30

Spruce Lane    


  • Worksite Identifier: Spruce Lane
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Southeast Alaska (190103)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 58.423528
  • Longitude: -135.757663

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Spruce Lane pre Spruce Lane during Spruce Lane after

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 170,486.00
    •      . . C.0.b Length of stream treated/protected .05
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 170,486.00
      •      . . . . C.2.b.1 Length of stream made accessible .12
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade .12