Lemhi Basin Habitat Improvement-PCSRF

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID016 12 SA
Recovery DomainsInterior Columbia
Start Date11/26/2013
End Date12/31/2016
Year2012
StatusCompleted
Last Edited05/17/2021
 
1 - 1

Description    


The following projects were addressed during this contract: 1) Amonson Upper Lemhi River Side Channels 0.30 miles - design for additional lateral fish habitat, side channels, and a more active floodplain. some environmental permitting was done as well. Total 2) Thor Upper Lemhi Channels 1.75 miles – design to restore flow to an important Chinook salmon production area in the upper Lemhi River and also developed a functional side channel with large woody debris structures. Construction oversight was provided for this. 3) Bohannon Creek #3 Diversion Flow Improvement 1.1 miles - design to deliver flow through a previously dewatered stream segment of lower Bohannon Creek. Water rights transfer application was prepared for this project. 4) Eagle Valley Lower Lemhi River 2.7 miles - design to restore natural function to a reach of the Lemhi river by creating pools and other slow water habitats, developing side channels and other lateral habitats, expanding the floodplain, and restoring riparian zones. Work included construction oversight and environmental permitting. 5) Stokes Lemhi River Bank 0.3 miles – design to stabilize an eroding streambank and develop instream habitat complexity for fish along a 500 ft segment of the lower Lemhi River. Work also included environmental permitting and construction oversight.

Project Benefit    


The condition of spawning and rearing habitat for ESA listed Chinook salmon and steelhead throughout the Lemhi River sub-basin will improve. Efforts will continue to be directed at priority tributaries to provide salmon access to historically important, high quality spawning and rearing habitat. Juvenile salmon produced in the Lemhi River will be able to access cooler water for rearing during summer, adult salmon will access good spawning habitat, and flow will be enhanced in the mainstem to improve habitat quality in existing production areas. Salmon and steelhead produced in the Lemhi will benefit directly from projects implemented within the current production areas, such as creating lateral habitats (side channels) complex river channels with good quality substrate necessary for spawning and protected and enhanced riparian zones. Concurrently, all these actions are expected to increase productivity, expand distribution, and improve genetic integrity of these stocks.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$214,765
Other$120,293
Report Total:$335,058


Project Map



Worksites

Amonson    


  • Worksite Identifier: Amonson
  • Start Date: 11/26/2013
  • End Date: 12/31/2016
Area Description
Upper Lemhi side channels

Location Information

  • Basin: Salmon
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Idaho
  • Recovery Domain: Interior Columbia
  • Latitude: 44.768002
  • Longitude: -113.511228

ESU

  • Snake River Basin Steelhead DPS
  • Snake River Spring/Summer-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 41,883.00
    •      . . B.0.b.1 Area Encompassed 13.0
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding 41,883.00
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
          NMFS. 2011. Draft Idaho Snake River Spring/Summer Chinook and Steelhead Recovery Plan.
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented
          1) Increase instream flow and 2) Improve riparian and instream habitats.

Thor    


  • Worksite Identifier: Thor
  • Start Date: 11/26/2013
  • End Date: 12/31/2016
Area Description
Upper Lemhi channels

Location Information

  • Basin: Salmon
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Idaho
  • Recovery Domain: Interior Columbia
  • Latitude: 44.756173
  • Longitude: -113.486113

ESU

  • Snake River Basin Steelhead DPS
  • Snake River Spring/Summer-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 83,764.00
    •      . . B.0.b.1 Area Encompassed 6.0
    •      . . B.0.b.2 Stream Miles Affected 1.75
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding 83,764.00
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
          NMFS. 2011. Draft Idaho Snake River Spring/Summer Chinook and Steelhead Recovery Plan.
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented
          Increase stream flows in the mainstem Lemhi River. Flow enhancement projects that contribute to currently connected sections of the Lemhi River and its tributaries are also a high priority.

Bohannon Creek    


  • Worksite Identifier: Bohannon Creek
  • Start Date: 11/26/2013
  • End Date: 12/31/2016
Area Description
Bohannon Creek

Location Information

  • Basin: Salmon
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Idaho
  • Recovery Domain: Interior Columbia
  • Latitude: 45.119598
  • Longitude: -113.766276

ESU

  • Snake River Basin Steelhead DPS
  • Snake River Spring/Summer-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 83,764.00
    •      . . B.0.b.1 Area Encompassed 5.0
    •      . . B.0.b.2 Stream Miles Affected 1.10
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding 83,764.00
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
          NMFS. 2011 Draft Idaho Snake River Spring/Summer Chinook and Steelhead Recovery Plan.
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented
          1) Increase instream flow and 2) Improve riparian and instream habitats.

Eagle Valley    


  • Worksite Identifier: Eagle Valley
  • Start Date: 11/26/2013
  • End Date: 12/31/2016
Area Description
Lower Lemhi River

Location Information

  • Basin: Salmon
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Idaho
  • Recovery Domain: Interior Columbia
  • Latitude: 45.111582
  • Longitude: -113.747325

ESU

  • Snake River Spring/Summer-run Chinook Salmon ESU
  • Snake River Basin Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 83,764.00
    •      . . B.0.b.1 Area Encompassed 7.0
    •      . . B.0.b.2 Stream Miles Affected 2.70
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding 83,764.00
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
          NMFS. 2011. Draft Idaho Snake River Spring/Summer Chinook and Steelhead Recovery Plan.
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented
          1) Increase instream flow and 2) Improve riparian and instream habitats.

Stokes    


  • Worksite Identifier: Stokes
  • Start Date: 11/26/2013
  • End Date: 12/31/2016
Area Description
Lemhi River Bank

Location Information

  • Basin: Salmon
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Idaho
  • Recovery Domain: Interior Columbia
  • Latitude: 45.114537
  • Longitude: -113.761431

ESU

  • Snake River Basin Steelhead DPS
  • Snake River Spring/Summer-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 41,883.00
    •      . . B.0.b.1 Area Encompassed 22.0
    •      . . B.0.b.2 Stream Miles Affected 5.95
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding 41,883.00
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
          NMFS. 2011. Draft Idaho Snake River Spring/Summer Chinook Salmon and Steelhead Recovery Plan.
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented
          1) Increase instream flows and 2) Improve riparian and instream habitats