Instream Flow Protection: AYK - Year 2

Salmonid Habitat Restoration and Acquisition

Instream Flow
Project IDAK44562
Recovery Domains -
Start Date12/01/2013
End Date11/30/2014
Year2009
StatusCompleted
Last Edited05/08/2024
 
1 - 1

Description    


Five reservation of water applications for the Yukon River (Reaches A-E) and four reservation of water applications for the Tanana River (Reaches A-D) were completed, filed with the Alaska Department of Natural Resources (DNR), and given a water right priority date. A section of the Kuskokwim River received a Certificate of Reservation. Reservations for one reach of the Tanana and three reaches of the Yukon were not completed by the end of the project.

Project Benefit    


The rivers and lakes of AYK support some of North America’s most viable and productive salmon fisheries. Salmon are dependent upon sufficient quantities of water to meet their spawning, rearing, incubation, overwintering, and migration habitat requirements. This project will benefit salmon populations (including those used for important subsistence fisheries) throughout AYK by legally reserving water needed to sustain salmon habitat and production.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$61,083
State$27,993
Report Total:$89,076


Project Map



Worksites

Yukon Reach A    


  • Worksite Identifier: Yukon Reach A
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Outlet Yukon River (190903)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 62.418939
  • Longitude: -163.844077

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,389.00
    •      . . C.0.b Length of stream treated/protected 150.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      none
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 9,389.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 150.00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year224015 (cfs)

Yukon Reach E    


  • Worksite Identifier: Yukon Reach E
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Beaver Creek-Yukon River (190804)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 65.51692
  • Longitude: -150.171846

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,386.00
    •      . . C.0.b Length of stream treated/protected 80.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 9,386.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 80.00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year116097 (cfs)

Tanana Reach C    


  • Worksite Identifier: Tanana Reach C
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Tanana River (190803)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 64.472914
  • Longitude: -146.991608

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,385.00
    •      . . C.0.b Length of stream treated/protected 53.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      none
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 9,385.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 53.00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year14467 (cfs)

Tanana Reach D    


  • Worksite Identifier: Tanana Reach D
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Tanana River (190803)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 64.157134
  • Longitude: -145.84824

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,386.00
    •      . . C.0.b Length of stream treated/protected 116.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      none
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 9,386.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 116.00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year7923 (cfs)

Yukon Reach D    


  • Worksite Identifier: Yukon Reach D
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Melozitna River-Yukon River (190902)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 65.135077
  • Longitude: -152.408645

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,386.00
    •      . . C.0.b Length of stream treated/protected 65.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      none
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 9,386.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 65.00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year121016 (cfs)

Tanana Reach A    


  • Worksite Identifier: Tanana Reach A
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Tanana River (190803)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 64.590445
  • Longitude: -148.659823

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,386.00
    •      . . C.0.b Length of stream treated/protected 36.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      none
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 9,386.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 36.00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year20789 (cfs)

Kuskokwim River     


  • Worksite Identifier: Kuskokwim River
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Outlet Yukon River (190903)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 62.869444
  • Longitude: -158.111388

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 4,603.00
    •      . . C.0.b Length of stream treated/protected 79.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      none
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 4,603.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 79.00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year34605 (cfs)

Yukon Reach B    


  • Worksite Identifier: Yukon Reach B
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Outlet Yukon River (190903)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 62.138855
  • Longitude: -159.746163

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,385.00
    •      . . C.0.b Length of stream treated/protected 230.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 9,385.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 230.00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year209644 (cfs)

Yukon Reach C    


  • Worksite Identifier: Yukon Reach C
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Melozitna River-Yukon River (190902)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 64.87273
  • Longitude: -157.683434

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,385.00
    •      . . C.0.b Length of stream treated/protected 175.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 9,385.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 175.00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year158817 (cfs)

Tanana Reach B    


  • Worksite Identifier: Tanana Reach B
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Tanana River (190803)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 64.794726
  • Longitude: -147.91417

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,385.00
    •      . . C.0.b Length of stream treated/protected 44.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 9,385.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 44.00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year19692 (cfs)

Tanana Reach E    


  • Worksite Identifier: Tanana Reach E
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Tanana River (190803)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 63.982130079047245
  • Longitude: -144.90600585936645

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding .00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow .00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year0 (cfs)

Yukon Reaches F-H    


  • Worksite Identifier: Yukon Reaches F-H
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Fortymile River-Yukon River (190705)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 66.12064871252274
  • Longitude: -144.47753906249147

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding .00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow .00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year0 (cfs)