Steelhead Spawning Gravel Enhancement - Below Los Padres Dam
Salmonid Habitat Restoration and Acquisition
|
724035 | S. California - S. Central CA Coast | 08/13/2013 | 03/30/2017 | 2012 | Completed | 01/25/2024 | |
| |
Description
The project enhanced adult steelhead spawning and juvenile steelhead rearing habitat downstream of Los Padres Dam, by placing 1,500 tons imported gravel downstream of the dam. The goal was to increase the amount of available spawning and rearing habitat by approximately 50% up to five miles downstream of the dam, in the mainstem Carmel River between the Los Padres Dam and San Clemente Dam (now reroute channel). This was accomplished by purchasing gravel and delivering it to the site in the Carmel River downstream of Los Padres Dam. Surveys to monitor gravel dispersal and biological conditions were conducted annually.
Project Benefit
Spawning and rearing habitat enhancement
Accomplishments
Instream Habitat |
Stream Miles Treated |
5.00 |
5.00 |
Funding Details |
PCSRF | $167,781 |
Other | $89,904 |
Report Total: | $257,685 |
|
| |
Worksites
7210434
- Worksite Identifier: 7210434
- Start Date:
- End Date:
Area Description
Carmel River - gravel placement reach
Location Information
- Basin: Central California Coastal (180600)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: S. California - S. Central CA Coast
- Latitude: 36.389
- Longitude: -121.666
ESU
- South-Central California Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 696,255.00
- . . C.0.b
Length of stream treated/protected 5.00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Carmel River Watershed Conservatory, 2007, Carmel River Watershed Assessment & Action Plan – 2007 Action Plan Matrix”, Carmel River Watershed Conservatory, Carmel, CA |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 257,685.00
- . . . . C.4.b
Total length of instream habitat treated 5.00
- . . . . C.4.f.1
Spawning gravel placementY (Y/N)
- . . . . . . C.4.f.2
Miles of stream treated with addition of spawning gravel 5.00
- . . . . . . C.4.f.3
Cubic yards of spawning gravel placed1500 (Cubic yards)
|
|