San Jose Creek Capacity Improvement and Fish Passage Project

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement
Project ID723591
Recovery DomainsS. California - S. Central CA Coast
Start Date06/07/2011
End Date04/15/2013
Year2010
StatusCompleted
Last Edited01/25/2024
 
1 - 1

Description    


Replaced the 4,250-foot trapezoidal flood control channel (25 year storm flow capacity) on San Jose Creek with a 100 year storm flow capacity channel with vertical walls and an articulated concrete revetment bottom; an internal fish passage channel in flood channel was installed with 40 weirs installed staggeredly every 100 feet creating 30 pools; removed barrier and 3.24 miles of stream length was made accessible to Steelhead migration by modifying blockage; 0.8 miles of overall stream length treated. Trees were planted to mitigate trees removed. 4250 feet of aquatic habitat disturbed.

Project Benefit    


To facilitate fish passage of steelhead salmon to their historical habitat and spawning grounds as part of a flood control capacity improvement project.

Accomplishments

Metric Completed Originally
Proposed
Fish Passage
  Barriers Removed
  Miles Opened 4.00 3.24

Funding Details

SourceFunds
PCSRF$750,000
Other$3,917,038
Report Total:$4,667,038


Project Map



Worksites

7209593    


  • Worksite Identifier: 7209593
  • Start Date:
  • End Date:
Area Description
San Jose Creek Capacity Improvement and Fish Passage project location

Location Information

  • Basin: Central California Coastal (180600)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: S. California - S. Central CA Coast
  • Latitude: 34.430657
  • Longitude: -119.822253

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 4,667,038.00
    •      . . C.0.b Length of stream treated/protected .80
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Steelhead Assessment and Recovery Opportunities in Southern Santa Barbara County, CA. Stoecker and Conception Coast 2002
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 4,667,038.00
      •      . . . . C.2.b.1 Length of stream made accessible 4.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.d.1 Fishway chutes or pools installedY (Y/N)