723428 | N Central California Coast | 06/01/2010 | 05/11/2012 | 2009 | Completed | 01/14/2025 | |
| |
Description
Failed culverts under Willow Creek Road were removed and a 43-foot long single span concrete bridge was installed.
Project Benefit
The goal of this project is to re-establish fish passage for coho salmon and steelhead trout in Willow Creek, tributary to The Russian River in Sonoma County. The objective of this project is to replace four failing culverts on Willow Creek at 2nd Bridge with a 43 foot long single span bridge. This is to provide access to 4.7 miles of spawning habitat for adult salmonids and rearing habitat for juvenile salmonids.
Accomplishments
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
4.70 |
4.00 |
Funding Details |
PCSRF | $352,990 |
Other | $42,552 |
Report Total: | $395,542 |
|
| |
Worksites
7209163
- Worksite Identifier: 7209163
- Start Date:
- End Date:
Area Description
Willow Creek - Barrier removal site (2nd Bridge)
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin: Russian (18010110)
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 38.436067
- Longitude: -123.086428
ESU
- Central California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 395,542.00
- . . C.0.b
Length of stream treated/protected .11
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Willow Creek Watershed Management Plan (PCI 2005b), Prunucke Chatham Inc., for Stewards of the Coast and Redwoods (Stewards), March 2005. |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 395,542.00
- . . . . C.2.b.1
Length of stream made accessible 4.70
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 4
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded 1
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade 4.70
|
|