Shea Meadows Phase II/Implementation
Salmonid Habitat Restoration and Acquisition
|
009 11 CW PII | Snake River | 10/22/2012 | 12/31/2014 | 2011 | Terminated | 01/14/2025 | |
| |
Description
Potlatch Corporation officials notified Idaho Department of Fish and Game (IDFG) in July, 2014, that they did not wish to complete the restoration project. IDFG personnel from the headquarters office contacted Potlatch officials shortly after to determine if there were any options for the project to move forward. A conference call was arranged and several IDFG and Potlatch officials participated. Potlatch officials agreed to take a second look at the restoration project to determine if there were options for the project to move forward. Potlatch determined that the project may hinder their ability to sell the property; therefore they did not want IDFG to implement the project. In August, IDFG was notified that the property had a buyer and that the restoration project needed to be discussed with the new owner.
In December, 2014, the new owner of Shea Meadows informed IDFG personnel that they would not be interested in continuing with the restoration efforts.
This project has been withdrawn.
Although the project has been withdrawn, actions completed on the project included 90% completion of the final design, permitting, and bidding of the project and pre-project (baseline) monitoring aka water quantity monitoring.. Funds were expended for the actions completed, but performance measures were not completed.
Project Benefit
The expected outcomes of the proposed action includes: An increase in base flow, reduction in stream temperature and sedimentation, reduction in high spring runoff and flashiness, reestablishment of channel and floodplain connection, reestablishment of riparian, upland and wetland vegetation, all of which will provide suitable habitat for ESA listed steelhead spawning and rearing.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.00 |
1.55 |
Wetland Habitat |
Acres Created |
|
|
Acres Treated |
.0 |
10.0 |
Riparian Habitat |
Stream Miles Treated |
.00 |
3.10 |
Acres Treated |
.0 |
60.0 |
Funding Details |
PCSRF | $100,655 |
Other | $157,314 |
Report Total: | $257,969 |
|
| |
Worksites
Shea Meadows Phase II
- Worksite Identifier: Shea Meadows Phase II
- Start Date: 04/01/2013
- End Date: 12/31/2014
Area Description
Potlatch River, 17060306, East Fork Corral Creek
Location Information
- Basin: Clearwater (170603)
- Subbasin: Clearwater (17060306)
- Watershed:
- Subwatershed:
- State: Idaho
- Recovery Domain: Snake River
- Latitude: 46.8568
- Longitude: -116.4835
ESU
- Snake River Basin Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 257,969.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Potlatch River Watershed Management Plan, Resource Planning Unlimited, October 2007, Latah Soil and Conservation District 220 East 5th, Moscow, Idaho |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 133,540.00
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity .00
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity .00
- . . . . . . C.4.c.5
Acres of off-channel or floodplain connected through channel reconfiguration and connectivity .0
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity 0
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .00
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 0
- . . . . . . C.4.d.7
Number of structures placed in channel 0
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .00
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 79,858.00
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated .0
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
none |
- . . . . . . C.5.c.3
Acres planted in riparian .0
- . . . . C.5.d.1
FencingY (Y/N)
- . . . . . . C.5.d.2
Miles of fence along stream .00
- . . . . . . C.5.d.3
Acres of riparian area protected by fencing .0
- . . C.8
Wetland ProjectY (Y/N)
- . . . . C.8.a
Wetland funding 44,571.00
- . . . . C.8.b
Total acres of wetland area treated .0
- . . . . C.8.c.1
Wetland plantingY (Y/N)
- . . . . . . C.8.c.2
Species of wetland plants planted | |
none |
- . . . . . . C.8.c.3
Acres of wetland planted .0
- . . . . C.8.e.1
Wetland improvement/restorationY (Y/N)
- . . . . . . C.8.e.2
Acres of wetland treated .0
|
|