Instream Flow Protection: Southeast – Phase 8 ROW
Salmonid Habitat Restoration and Acquisition
|
AK44552_ROW | - | 12/01/2012 | 11/30/2013 | 2009 | Completed | 05/08/2024 | |
| |
Description
Reservation of water applications for Rocky Pass Creek, the Speel River, and five reaches of the Lost River were filed with the Alaska Department of Natural Resources (DNR). The Cowee Creek and Chilkoot River reservation applications, previously filed with DNR with three years of gage data, were updated using the complete five years of stream gage data. A Certificate of Reservation was awarded for the Harding River. The previously-filed Peterson Creek multiple-reach reservation application was converted into nine separate reservation applications and re-filed with DNR. The previously-filed Nakwasina River multiple-reach reservation application was converted into seven separate reservation applications and refiled with DNR. Other reservation of water applications were worked on, but not completed.
Project Benefit
The rivers and lakes of SEAK support some of North America’s most viable and productive salmon and steelhead fisheries. Salmon and steelhead are dependent upon sufficient quantities of water to meet their spawning, rearing, incubation, overwintering, and migration habitat requirements. This project will benefit salmon and steelhead populations (including those used for important subsistence fisheries) throughout SEAK by legally reserving water needed to sustain salmon and steelhead habitat and production.
Funding Details |
PCSRF | $42,846 |
State | $19,018 |
Report Total: | $61,864 |
|
| |
Worksites
Lost River Reach A
- Worksite Identifier: Lost River Reach A
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Gulf of Alaska (190104)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 59.457436
- Longitude: -139.617514
ESU
- Un-Named ESU Coho
- Un-Named ESU Sockeye
- Un-Named ESU Steelhead
- Un-Named ESU Pink
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 3,000.00
- . . C.0.b
Length of stream treated/protected 1.40
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
none |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.3
Instream Flow ProjectY (Y/N)
- . . . . C.3.a
Instream Flow Funding 3,000.00
- . . . . C.3.b
Length of stream 'protected' for adequate flow 1.40
- . . . . C.3.c
Change in water flow0 (cfs)
- . . . . C.3.g.1
Maintaining adequate flow or reducing withdrawalsY (Y/N)
- . . . . . . C.3.g.2
cfs (cubic feet per second) of water conserved per year187 (cfs)
Chilkoot River
- Worksite Identifier: Chilkoot River
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Northern Southeast Alaska (190103)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 59.335471
- Longitude: -135.559791
ESU
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Cutthroat
- Un-Named ESU Pink
- Un-Named ESU Sockeye
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 4,450.00
- . . C.0.b
Length of stream treated/protected 1.20
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
none |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.3
Instream Flow ProjectY (Y/N)
- . . . . C.3.a
Instream Flow Funding 4,450.00
- . . . . C.3.b
Length of stream 'protected' for adequate flow 1.20
- . . . . C.3.c
Change in water flow0 (cfs)
- . . . . C.3.g.1
Maintaining adequate flow or reducing withdrawalsY (Y/N)
- . . . . . . C.3.g.2
cfs (cubic feet per second) of water conserved per year723 (cfs)
Cowee Creek
- Worksite Identifier: Cowee Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Northern Southeast Alaska (190103)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 58.654672
- Longitude: -134.915233
ESU
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Steelhead
- Un-Named ESU Cutthroat
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 18,052.00
- . . C.0.b
Length of stream treated/protected 2.14
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
none |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.3
Instream Flow ProjectY (Y/N)
- . . . . C.3.a
Instream Flow Funding 18,052.00
- . . . . C.3.b
Length of stream 'protected' for adequate flow 2.14
- . . . . C.3.c
Change in water flow0 (cfs)
- . . . . C.3.g.1
Maintaining adequate flow or reducing withdrawalsY (Y/N)
- . . . . . . C.3.g.2
cfs (cubic feet per second) of water conserved per year244 (cfs)
Harding River
- Worksite Identifier: Harding River
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Southeast Alaska (190101)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 56.207242
- Longitude: -131.624911
ESU
- Un-Named ESU Chinook
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Sockeye
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 6,000.00
- . . C.0.b
Length of stream treated/protected 20.70
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
none |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.3
Instream Flow ProjectY (Y/N)
- . . . . C.3.a
Instream Flow Funding 6,000.00
- . . . . C.3.b
Length of stream 'protected' for adequate flow 20.70
- . . . . C.3.c
Change in water flow0 (cfs)
- . . . . C.3.g.1
Maintaining adequate flow or reducing withdrawalsY (Y/N)
- . . . . . . C.3.g.2
cfs (cubic feet per second) of water conserved per year500 (cfs)
Rocky Pass
- Worksite Identifier: Rocky Pass
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 56.623447
- Longitude: -133.727094
ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 9,500.00
- . . C.0.b
Length of stream treated/protected 1.30
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
none |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.3
Instream Flow ProjectY (Y/N)
- . . . . C.3.a
Instream Flow Funding 9,500.00
- . . . . C.3.b
Length of stream 'protected' for adequate flow 1.30
- . . . . C.3.c
Change in water flow0 (cfs)
- . . . . C.3.g.1
Maintaining adequate flow or reducing withdrawalsY (Y/N)
- . . . . . . C.3.g.2
cfs (cubic feet per second) of water conserved per year6 (cfs)
Speel River
- Worksite Identifier: Speel River
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 58.135267
- Longitude: -133.721261
ESU
- Un-Named ESU Sockeye
- Un-Named ESU Coho
- Un-Named ESU Chum
- Un-Named ESU Pink
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 9,500.00
- . . C.0.b
Length of stream treated/protected 6.50
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
none |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.3
Instream Flow ProjectY (Y/N)
- . . . . C.3.a
Instream Flow Funding 9,500.00
- . . . . C.3.b
Length of stream 'protected' for adequate flow 6.50
- . . . . C.3.c
Change in water flow0 (cfs)
- . . . . C.3.g.1
Maintaining adequate flow or reducing withdrawalsY (Y/N)
- . . . . . . C.3.g.2
cfs (cubic feet per second) of water conserved per year2296 (cfs)
Lost River Reach B
- Worksite Identifier: Lost River Reach B
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Gulf of Alaska (190104)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 59.467586
- Longitude: -139.614697
ESU
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Sockeye
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 2,362.00
- . . C.0.b
Length of stream treated/protected 1.20
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
None |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.3
Instream Flow ProjectY (Y/N)
- . . . . C.3.a
Instream Flow Funding 2,362.00
- . . . . C.3.b
Length of stream 'protected' for adequate flow 1.20
- . . . . C.3.c
Change in water flow0 (cfs)
- . . . . C.3.g.1
Maintaining adequate flow or reducing withdrawalsY (Y/N)
- . . . . . . C.3.g.2
cfs (cubic feet per second) of water conserved per year105 (cfs)
Lost River Reach C
- Worksite Identifier: Lost River Reach C
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Gulf of Alaska (190104)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 59.478547
- Longitude: -139.605869
ESU
- Un-Named ESU Coho
- Un-Named ESU Sockeye
- Un-Named ESU Pink
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 3,000.00
- . . C.0.b
Length of stream treated/protected .60
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
None |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.3
Instream Flow ProjectY (Y/N)
- . . . . C.3.a
Instream Flow Funding 3,000.00
- . . . . C.3.b
Length of stream 'protected' for adequate flow .60
- . . . . C.3.c
Change in water flow0 (cfs)
- . . . . C.3.g.1
Maintaining adequate flow or reducing withdrawalsY (Y/N)
- . . . . . . C.3.g.2
cfs (cubic feet per second) of water conserved per year63 (cfs)
Lost River Reach D
- Worksite Identifier: Lost River Reach D
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Gulf of Alaska (190104)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 59.479389
- Longitude: -139.606308
ESU
- Un-Named ESU Coho
- Un-Named ESU Sockeye
- Un-Named ESU Pink
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 3,000.00
- . . C.0.b
Length of stream treated/protected .50
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
None |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.3
Instream Flow ProjectY (Y/N)
- . . . . C.3.a
Instream Flow Funding 3,000.00
- . . . . C.3.b
Length of stream 'protected' for adequate flow .50
- . . . . C.3.c
Change in water flow0 (cfs)
- . . . . C.3.g.1
Maintaining adequate flow or reducing withdrawalsY (Y/N)
- . . . . . . C.3.g.2
cfs (cubic feet per second) of water conserved per year36 (cfs)
Lost River Reach E
- Worksite Identifier: Lost River Reach E
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Gulf of Alaska (190104)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 59.467497
- Longitude: -139.614925
ESU
- Un-Named ESU Coho
- Un-Named ESU Sockeye
- Un-Named ESU Pink
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 3,000.00
- . . C.0.b
Length of stream treated/protected 1.80
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
None |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.3
Instream Flow ProjectY (Y/N)
- . . . . C.3.a
Instream Flow Funding 3,000.00
- . . . . C.3.b
Length of stream 'protected' for adequate flow 1.80
- . . . . C.3.c
Change in water flow0 (cfs)
- . . . . C.3.g.1
Maintaining adequate flow or reducing withdrawalsY (Y/N)
- . . . . . . C.3.g.2
cfs (cubic feet per second) of water conserved per year81 (cfs)
|
|