Description    


Reservation of water applications for Rocky Pass Creek, the Speel River, and five reaches of the Lost River were filed with the Alaska Department of Natural Resources (DNR). The Cowee Creek and Chilkoot River reservation applications, previously filed with DNR with three years of gage data, were updated using the complete five years of stream gage data. A Certificate of Reservation was awarded for the Harding River. The previously-filed Peterson Creek multiple-reach reservation application was converted into nine separate reservation applications and re-filed with DNR. The previously-filed Nakwasina River multiple-reach reservation application was converted into seven separate reservation applications and refiled with DNR. Other reservation of water applications were worked on, but not completed.

Project Benefit    


The rivers and lakes of SEAK support some of North America’s most viable and productive salmon and steelhead fisheries. Salmon and steelhead are dependent upon sufficient quantities of water to meet their spawning, rearing, incubation, overwintering, and migration habitat requirements. This project will benefit salmon and steelhead populations (including those used for important subsistence fisheries) throughout SEAK by legally reserving water needed to sustain salmon and steelhead habitat and production.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$42,846
State$19,018
Report Total:$61,864


Project Map



Worksites

Lost River Reach A    


  • Worksite Identifier: Lost River Reach A
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Gulf of Alaska (190104)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 59.457436
  • Longitude: -139.617514

ESU

  • Un-Named ESU Coho
  • Un-Named ESU Sockeye
  • Un-Named ESU Steelhead
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 3,000.00
    •      . . C.0.b Length of stream treated/protected 1.40
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      none
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 3,000.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 1.40
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year187 (cfs)

Chilkoot River    


  • Worksite Identifier: Chilkoot River
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Southeast Alaska (190103)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 59.335471
  • Longitude: -135.559791

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Cutthroat
  • Un-Named ESU Pink
  • Un-Named ESU Sockeye

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 4,450.00
    •      . . C.0.b Length of stream treated/protected 1.20
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      none
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 4,450.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 1.20
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year723 (cfs)

Cowee Creek    


  • Worksite Identifier: Cowee Creek
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Northern Southeast Alaska (190103)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 58.654672
  • Longitude: -134.915233

ESU

  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead
  • Un-Named ESU Cutthroat

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 18,052.00
    •      . . C.0.b Length of stream treated/protected 2.14
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      none
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 18,052.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 2.14
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year244 (cfs)

Harding River    


  • Worksite Identifier: Harding River
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Southeast Alaska (190101)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 56.207242
  • Longitude: -131.624911

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Sockeye

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,000.00
    •      . . C.0.b Length of stream treated/protected 20.70
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      none
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 6,000.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 20.70
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year500 (cfs)

Rocky Pass    


  • Worksite Identifier: Rocky Pass
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Central Southeast Alaska (190102)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 56.623447
  • Longitude: -133.727094

ESU

  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,500.00
    •      . . C.0.b Length of stream treated/protected 1.30
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      none
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 9,500.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 1.30
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year6 (cfs)

Speel River    


  • Worksite Identifier: Speel River
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Central Southeast Alaska (190102)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 58.135267
  • Longitude: -133.721261

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Coho
  • Un-Named ESU Chum
  • Un-Named ESU Pink

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,500.00
    •      . . C.0.b Length of stream treated/protected 6.50
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      none
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 9,500.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 6.50
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year2296 (cfs)

Lost River Reach B    


  • Worksite Identifier: Lost River Reach B
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Gulf of Alaska (190104)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 59.467586
  • Longitude: -139.614697

ESU

  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Sockeye
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 2,362.00
    •      . . C.0.b Length of stream treated/protected 1.20
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 2,362.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 1.20
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year105 (cfs)

Lost River Reach C    


  • Worksite Identifier: Lost River Reach C
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Gulf of Alaska (190104)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 59.478547
  • Longitude: -139.605869

ESU

  • Un-Named ESU Coho
  • Un-Named ESU Sockeye
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 3,000.00
    •      . . C.0.b Length of stream treated/protected .60
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 3,000.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow .60
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year63 (cfs)

Lost River Reach D    


  • Worksite Identifier: Lost River Reach D
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Gulf of Alaska (190104)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 59.479389
  • Longitude: -139.606308

ESU

  • Un-Named ESU Coho
  • Un-Named ESU Sockeye
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 3,000.00
    •      . . C.0.b Length of stream treated/protected .50
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 3,000.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow .50
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year36 (cfs)

Lost River Reach E    


  • Worksite Identifier: Lost River Reach E
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Gulf of Alaska (190104)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Alaska
  • Recovery Domain:
  • Latitude: 59.467497
  • Longitude: -139.614925

ESU

  • Un-Named ESU Coho
  • Un-Named ESU Sockeye
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 3,000.00
    •      . . C.0.b Length of stream treated/protected 1.80
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 3,000.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 1.80
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year81 (cfs)