Ventura River Streambank Restoration Maintenance

Salmonid Habitat Restoration and Acquisition

Project ID723290
Recovery DomainsS. California - S. Central CA Coast
Start Date11/24/2008
End Date02/15/2009
Year2006
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


Improved water quantity and survival of the willow baffles and the native plants planted as part of the original Ventura River Streambank Restoration Project.

Project Benefit    


Improve water quantity and survival of the willow baffles and the native plants planted as part of the original Ventura River Streambank Restoration Project. The original project was conducted as a way to minimize sediment entry into the lower Ventura River for the benefit of Southern steelhead trout inhabiting the Ventura River and to provide long term stability to the floodplain of the Ventura River. Due to significant damage caused by coyotes and other small mammals, it is necessary to install an irrigation system that is less susceptible to failure due to chewing animals and increase the depth and extent of the mulch cover to reduce weeds and the amount of time required for weeding non-native invasive weeds.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
State$4,367
Report Total:$4,367


Project Map



Worksites

7208718    


  • Worksite Identifier: 7208718
  • Start Date:
  • End Date:
Area Description
Ventura River - Bank Restoration Maintenance Site

Location Information

  • Basin: Ventura-San Gabriel Coastal (180701)
  • Subbasin:
  • Watershed: Ventura River
  • Subwatershed:
  • State: California
  • Recovery Domain: S. California - S. Central CA Coast
  • Latitude: 34.376967
  • Longitude: -119.307874

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 4,367.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      N/A
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.11 Site maintenance projectY (Y/N)
      •      . . . . C.11.a Site maintenance funding 4,366.55
      •      . . . . C.11.b.1 Stream or streambank maintainedY (Y/N)
        •      . . . . . . C.11.b.2 Miles of streambank maintained .01