Bear Creek Sediment Reduction for Coho Recovery

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat Upland Habitat And Sediment
Project ID722332
Recovery DomainsN Central California Coast
Start Date06/01/2007
End Date05/05/2009
Year2006
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


75 stream crossings upgraded, 2.5 miles of road treated, 1750 of stream bank stabilized. 39,510 cubic yards of sediment prevented from delivery. Treated one fish passage site opening up 1.2 miles of habitat. Added 10 cy spawning gravel.

Project Benefit    


Improve: Excessive sediment, Fish passage

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .22 .22
Fish Passage
  Barriers Removed
  Miles Opened 1.20 1.20

Funding Details

SourceFunds
State$236,239
Report Total:$236,239


Project Map



Worksites

7208334    


  • Worksite Identifier: 7208334
  • Start Date:
  • End Date:
Area Description
Bear Creek - sediment reduction - sites LB1-20, 29

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.135785
  • Longitude: -124.008923

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 23,624.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 23,623.90
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area .10
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .10

7208335    


  • Worksite Identifier: 7208335
  • Start Date:
  • End Date:
Area Description
Bear Creek - sediment reduction - sites fc1-11, LB31-32

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.133737
  • Longitude: -124.001687

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 47,248.00
    •      . . C.0.b Length of stream treated/protected .12
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 23,623.90
      •      . . . . C.4.b Total length of instream habitat treated .12
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .00
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 0
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .12
      •      . . . . C.4.f.1 Spawning gravel placementY (Y/N)
        •      . . . . . . C.4.f.2 Miles of stream treated with addition of spawning gravel .12
        •      . . . . . . C.4.f.3 Cubic yards of spawning gravel placed10 (Cubic yards)
      •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
        •      . . . . C.6.a Upland Habitat / Sediment Funding 23,623.90
        •      . . . . C.6.b.1 Acres of upland habitat area treated .0
        •      . . . . C.6.b.2 Miles of road treated in upland area .06
        •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
          •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .06

7208336    


  • Worksite Identifier: 7208336
  • Start Date:
  • End Date:
Area Description
Bear Creek - sediment reduction - sites wc1-12

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.131661
  • Longitude: -123.997038

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 70,872.00
    •      . . C.0.b Length of stream treated/protected 1.30
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 23,623.90
      •      . . . . C.2.b.1 Length of stream made accessible 1.20
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade 1.20
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 23,623.90
        •      . . . . C.4.b Total length of instream habitat treated .10
        •      . . . . C.4.d.1 Channel structure placementY (Y/N)
          •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
          •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .10
          •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
          •      . . . . . . C.4.d.7 Number of structures placed in channel 0
        •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
          •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
          •      . . . . . . C.4.e.3 Miles of streambank stabilized .00
        •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
          •      . . . . C.6.a Upland Habitat / Sediment Funding 23,623.90
          •      . . . . C.6.b.1 Acres of upland habitat area treated .0
          •      . . . . C.6.b.2 Miles of road treated in upland area .10
          •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
            •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .10

7208331    


  • Worksite Identifier: 7208331
  • Start Date:
  • End Date:
Area Description
Bear Creek - sediment reduction - sites nb12-15, han5, LB44, 38-42

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.147724
  • Longitude: -124.067056

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 23,624.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 23,623.90
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area .40
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .40

7208332    


  • Worksite Identifier: 7208332
  • Start Date:
  • End Date:
Area Description
Bear Creek - sediment reduction - sites LB54-73

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.134088
  • Longitude: -124.04992

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 23,624.00
    •      . . C.0.b Length of stream treated/protected .03
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 23,623.90
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area 1.00
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction 1.00

7207957    


  • Worksite Identifier: 7207957
  • Start Date:
  • End Date:
Area Description
Bear Creek - sediment reduction - sites nb1-11

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.158264
  • Longitude: -124.085575

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 23,624.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 23,623.90
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area .76
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .76

7208333    


  • Worksite Identifier: 7208333
  • Start Date:
  • End Date:
Area Description
Bear Creek - sediment reduction - sites LB48-53, 21-26, 33-37

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.123789
  • Longitude: -124.033558

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 23,624.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 23,623.90
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area .20
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .20