Blue Slide, Mattole Canyon, and Grindstone Creeks Sediment Reduction for Coho Recovery

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat Upland Habitat And Sediment
Project ID722313
Recovery DomainsN Central California Coast
Start Date06/01/2007
End Date10/27/2009
Year2006
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


43 channel/bank stab features, stabilized 1.87 miles bank, 13 decom stream xings, 101 upgraded stream xings, 4 upslope stab features, 1.34 miles road, 1 fish passage, opened 0.4 miles, prevented delivery 182,455 cy sediment; added 110 cy spawning gravel.

Project Benefit    


Improve: Excessive sediment, Fish passage

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .84 .84
Upland Habitat
  Acres Treated .4 .4

Funding Details

SourceFunds
PCSRF$238,602
Report Total:$238,602


Project Map



Worksites

7208305    


  • Worksite Identifier: 7208305
  • Start Date:
  • End Date:
Area Description
Mattole Canyon - sites sta19, 24-32

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.193251
  • Longitude: -124.040327

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 18,354.00
    •      . . C.0.b Length of stream treated/protected .03
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 9,177.00
      •      . . . . C.4.b Total length of instream habitat treated .03
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .03
      •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
        •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
        •      . . . . C.6.b.1 Acres of upland habitat area treated .0
        •      . . . . C.6.b.2 Miles of road treated in upland area .10
        •      . . . . C.6.d.1 Road closure / abandonmentY (Y/N)
          •      . . . . . . C.6.d.2 Miles of road closed / abandoned .10

7208306    


  • Worksite Identifier: 7208306
  • Start Date:
  • End Date:
Area Description
Mattole Canyon - sites sta17-18, 20-21

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.196123
  • Longitude: -124.028511

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 18,354.00
    •      . . C.0.b Length of stream treated/protected .03
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 9,177.00
      •      . . . . C.4.b Total length of instream habitat treated .05
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .05
      •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
        •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
        •      . . . . C.6.b.1 Acres of upland habitat area treated .0
        •      . . . . C.6.b.2 Miles of road treated in upland area .10
        •      . . . . C.6.d.1 Road closure / abandonmentY (Y/N)
          •      . . . . . . C.6.d.2 Miles of road closed / abandoned .10

7208308    


  • Worksite Identifier: 7208308
  • Start Date:
  • End Date:
Area Description
Mattole Canyon - sites 46-47, 49

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.180802
  • Longitude: -124.014862

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,177.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area .10
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .10

7208311    


  • Worksite Identifier: 7208311
  • Start Date:
  • End Date:
Area Description
Grindstone Creek - sites mcc1,3, 7-8, 10, coy 2, and gen1

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.16133
  • Longitude: -123.984364

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,177.00
    •      . . C.0.b Length of stream treated/protected .12
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 9,177.00
      •      . . . . C.4.b Total length of instream habitat treated .16
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .16
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 3
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .15

7208312    


  • Worksite Identifier: 7208312
  • Start Date:
  • End Date:
Area Description
Grinstone Creek - sites doy1, 3, eng1-4, coy7-9

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.164221
  • Longitude: -123.984929

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,177.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area .10
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .10

7208313    


  • Worksite Identifier: 7208313
  • Start Date:
  • End Date:
Area Description
Grindstone Creek - sites mac1-5

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.162394
  • Longitude: -123.988985

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,177.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area .10
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .10

7208314    


  • Worksite Identifier: 7208314
  • Start Date:
  • End Date:
Area Description
Grindstone Creek - sites mag1, ccr22

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.160377
  • Longitude: -123.964925

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,177.00
    •      . . C.0.b Length of stream treated/protected .02
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 9,177.00
      •      . . . . C.4.b Total length of instream habitat treated .02
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .02

7208315    


  • Worksite Identifier: 7208315
  • Start Date:
  • End Date:
Area Description
Mattole Canyon - sites phe32-33, 18-20

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.187719
  • Longitude: -123.944501

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,177.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area .10
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .10

7208317    


  • Worksite Identifier: 7208317
  • Start Date:
  • End Date:
Area Description
Mattole Canyon - site phe 8

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.168765
  • Longitude: -123.939831

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,177.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area .10
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .10

7208320    


  • Worksite Identifier: 7208320
  • Start Date:
  • End Date:
Area Description
Blue Slide Creek - sites nol1-6, 8-9, 12-13, bra1, 8, 10, col1, spe1, 5,4, rol29, 24, 21, 20, ,4, 10

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.147249
  • Longitude: -123.935363

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 27,531.00
    •      . . C.0.b Length of stream treated/protected .92
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 9,177.00
      •      . . . . C.2.b.1 Length of stream made accessible .00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade .00
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 9,177.00
        •      . . . . C.4.b Total length of instream habitat treated .00
        •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
          •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
          •      . . . . . . C.4.e.3 Miles of streambank stabilized .92
        •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
          •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
          •      . . . . C.6.b.1 Acres of upland habitat area treated .0
          •      . . . . C.6.b.2 Miles of road treated in upland area .25
          •      . . . . C.6.d.1 Road closure / abandonmentY (Y/N)
            •      . . . . . . C.6.d.2 Miles of road closed / abandoned .25

7208321    


  • Worksite Identifier: 7208321
  • Start Date:
  • End Date:
Area Description
Blue Slide Creek - sites fla3-4, ccr 2

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.114273
  • Longitude: -123.954107

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,177.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area .10
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .10

7208322    


  • Worksite Identifier: 7208322
  • Start Date:
  • End Date:
Area Description
Blue Slide Creek - sites cul2, 4, orl1, 3

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.137
  • Longitude: -123.936849

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,177.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area .10
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .10

7208323    


  • Worksite Identifier: 7208323
  • Start Date:
  • End Date:
Area Description
Blue Slide Creek - sites smi5-7, mie1-2, lea7-8

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.159556
  • Longitude: -123.954683

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,177.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area .30
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .30

7208325    


  • Worksite Identifier: 7208325
  • Start Date:
  • End Date:
Area Description
Blue Slide Creek - sites ccr21, rom1-4, 6-9

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.144776
  • Longitude: -123.966544

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,177.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area .10
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .10

7207956    


  • Worksite Identifier: 7207956
  • Start Date:
  • End Date:
Area Description
Mattole Canyon - sites sta50-51

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.214396
  • Longitude: -124.032125

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 18,354.00
    •      . . C.0.b Length of stream treated/protected .31
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 9,177.00
      •      . . . . C.4.b Total length of instream habitat treated .25
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .00
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 15
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .25
      •      . . . . C.4.f.1 Spawning gravel placementY (Y/N)
        •      . . . . . . C.4.f.2 Miles of stream treated with addition of spawning gravel .25
        •      . . . . . . C.4.f.3 Cubic yards of spawning gravel placed110 (Cubic yards)
      •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
        •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
        •      . . . . C.6.b.1 Acres of upland habitat area treated .4
        •      . . . . C.6.b.2 Miles of road treated in upland area .06
        •      . . . . C.6.d.1 Road closure / abandonmentY (Y/N)
          •      . . . . . . C.6.d.2 Miles of road closed / abandoned .06

7208304    


  • Worksite Identifier: 7208304
  • Start Date:
  • End Date:
Area Description
Mattole Canyon -sites sta1-10

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.206294
  • Longitude: -124.038397

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,177.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area .10
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .10

7208307    


  • Worksite Identifier: 7208307
  • Start Date:
  • End Date:
Area Description
Mattole Canyon - sites sta13-16, 33-36, 36-40, 44-45

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.195083
  • Longitude: -124.020668

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,177.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated .0
      •      . . . . C.6.b.2 Miles of road treated in upland area .10
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .10

7208316    


  • Worksite Identifier: 7208316
  • Start Date:
  • End Date:
Area Description
Mattole Canyon - sites phe50-51, 53, 55-56

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.182592
  • Longitude: -123.948805

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 18,354.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 9,177.00
      •      . . . . C.4.b Total length of instream habitat treated .01
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .01
      •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
        •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
        •      . . . . C.6.b.1 Acres of upland habitat area treated .0
        •      . . . . C.6.b.2 Miles of road treated in upland area .61
        •      . . . . C.6.d.1 Road closure / abandonmentY (Y/N)
          •      . . . . . . C.6.d.2 Miles of road closed / abandoned .61

7208324    


  • Worksite Identifier: 7208324
  • Start Date:
  • End Date:
Area Description
Blue Slide Creek - sites mes1, sch4-9, ccr12-14, 16-19, gia1

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Mattole River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.138367
  • Longitude: -123.972482

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 18,354.00
    •      . . C.0.b Length of stream treated/protected .33
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Strategy for the recovery of California Coho Salmon (CDFG 2004); Steelhead Restoration and Management Plan (McEwan and Jackson, 1996); NCWAP Mattole Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 9,177.00
      •      . . . . C.4.b Total length of instream habitat treated .31
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .31
      •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
        •      . . . . C.6.a Upland Habitat / Sediment Funding 9,177.00
        •      . . . . C.6.b.1 Acres of upland habitat area treated .0
        •      . . . . C.6.b.2 Miles of road treated in upland area .30
        •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
          •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .30