Walters Creek Riparian Restoration Enhancement Project

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID721907
Recovery DomainsS. California - S. Central CA Coast
Start Date07/01/2005
End Date02/15/2007
Year2004
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


Back-fill and seal 4 rock weir structures. Cover 2 exposed willow mattresses. Repair and control erosion with rock material on upstream side of culvert. Control upslope erosion at 3 seasonal tributary crossings.

Project Benefit    


Project will improve habitat by controlling stream bank and non-point sources of erosion, stabilizing instream habitat by reinforcing previously constructed rock grade control structures, and increasing vegetative canopy along the creek. These measures will ultimately yield long term benefits to steelhead by decreasing sediment and providing canopy to reduce water temperatures.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .05 .05

Funding Details

SourceFunds
State$23,915
Report Total:$23,915


Project Map



Worksites

7208360    


  • Worksite Identifier: 7208360
  • Start Date:
  • End Date:
Area Description
Walters Creek Riparian Enhancement Project

Location Information

  • Basin: Central California Coastal (180600)
  • Subbasin:
  • Watershed: Morro Creek-Frontal Pacific Ocean
  • Subwatershed:
  • State: California
  • Recovery Domain: S. California - S. Central CA Coast
  • Latitude: 35.349152
  • Longitude: -120.747985

ESU

  • South-Central California Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 23,915.00
    •      . . C.0.b Length of stream treated/protected .05
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Section 4(a)(1) of the ESA
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 23,915.00
      •      . . . . C.4.b Total length of instream habitat treated .05
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .05