Owens East Fork Scott River Bank Stabilization & Riparian Enhancement
Salmonid Habitat Restoration and Acquisition
|
721770 | N CA - S Oregon | 09/15/2006 | 11/30/2006 | 2004 | Completed | 01/26/2024 | |
| |
Description
Five deflectors were installed within 562 ft of river bank project area. Armor base of river bank in-between deflectors. Installed 1244 ft of livestock fencing with an average of 103 ft set back.
Project Benefit
Improve instream habitat conditions with log/boulder structures. Control erosion of the river bank. Protect and enhance the riparian area.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.11 |
.11 |
Riparian Habitat |
Stream Miles Treated |
.11 |
.11 |
Acres Treated |
.0 |
.0 |
Funding Details |
State | $24,947 |
Report Total: | $24,947 |
|
| |
Worksites
7205057
- Worksite Identifier: 7205057
- Start Date:
- End Date:
Area Description
Scott River, E. Fk. Watershed - Owens Site (bank stabilization and riparian restoration)
Location Information
- Basin: Klamath (180102)
- Subbasin:
- Watershed: East Fork Scott River
- Subwatershed:
- State: California
- Recovery Domain: N CA - S Oregon
- Latitude: 41.305208
- Longitude: -122.791273
ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 24,947.00
- . . C.0.b
Length of stream treated/protected .11
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Strategy for the recovery of California Coho Salmon (CDFG 2004) |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 12,473.50
- . . . . C.4.b
Total length of instream habitat treated .11
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .11
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 12,473.50
- . . . . C.5.b.1
Total riparian miles streambank treated .11
- . . . . C.5.b.2
Total Riparian Acres Treated .0
- . . . . C.5.d.1
FencingY (Y/N)
- . . . . . . C.5.d.2
Miles of fence along stream .24
|
|