Cedar Creek Fish Passage Restoration Project

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat
Project ID721668
Recovery DomainsN CA - S Oregon
Start Date06/01/2006
End Date03/31/2008
Year2004
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


The bridge abutments moved a few feet upstream but overall the bridge, grade control weirs and roughened channel were built as designed.

Project Benefit    


Fish passage for adults and increased spawning habitat and cover at construction site.

Accomplishments

Metric Completed Originally
Proposed
Fish Passage
  Barriers Removed
  Miles Opened 1.10 1.10

Funding Details

SourceFunds
PCSRF$358,644
State$1,000
Report Total:$359,644


Project Map



Worksites

7207053    


  • Worksite Identifier: 7207053
  • Start Date:
  • End Date:
Area Description
Cedar Creek - Douglas Park Dr. crossing (fish passage improvement)

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin: Smith River
  • Watershed: Smith River-Frontal Pacific Ocean
  • Subwatershed:
  • State: California
  • Recovery Domain: N CA - S Oregon
  • Latitude: 41.789136
  • Longitude: -124.077784

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 359,644.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Smith River Anadromous Fish Action Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 179,822.00
      •      . . . . C.2.b.1 Length of stream made accessible 1.10
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade 1.10
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 179,822.00
        •      . . . . C.4.b Total length of instream habitat treated .00
        •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
          •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
          •      . . . . . . C.4.e.3 Miles of streambank stabilized .00