Trinity River at Indian Creek Flow Rehabilitation Project
Salmonid Habitat Restoration and Acquisition
|
721591 | N CA - S Oregon | 06/01/2006 | 03/31/2008 | 2005 | Completed | 01/26/2024 | |
| |
Description
Approximately 1/2 mile of side channel and bank feathering at Weaver Creek; 1/4 mile bank feathering at Indian creek, no side channel; and an undetermined number of riparian berm notches at Vitchum Gulch.
Project Benefit
Restore the historic alluvial processes of the Trinity River thereby improving the limiting factors addressed.
Funding Details |
State | $561,330 |
Report Total: | $561,330 |
|
| |
Worksites
7206978
- Worksite Identifier: 7206978
- Start Date:
- End Date:
Area Description
Trinity River - Indian Creek Area RM 93.77-96.5 (flow rehabilitation project)
Location Information
- Basin: Klamath (180102)
- Subbasin:
- Watershed: Weaver Creek-Trinity River
- Subwatershed:
- State: California
- Recovery Domain: N CA - S Oregon
- Latitude: 40.659037
- Longitude: -122.91731
ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 561,330.00
- . . C.0.b
Length of stream treated/protected .50
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
N/A |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 561,329.97
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity .50
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity .00
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity 0
|
|