720117 | S. California - S. Central CA Coast | 06/10/2003 | 12/31/2003 | 2001 | Completed | 01/26/2024 | |
| |
Description
Constructed 1 rock weir, grouted in place 2 existing boulder clusters, created series of 3 step pools 50 ft downstream from culvert concrete apron, constructed new vortex weir 7 meters downstream of concrete apron, grouted in place 2 boulder clusters.
Project Benefit
Enhance fish passage opportunities on San Luis Obispo Creek at the base of the Cuesta Grade section of Highway 101 (about 2.75 miles north of the City of San Luis Obispo).
Accomplishments
Instream Habitat |
Stream Miles Treated |
.01 |
.01 |
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
1.50 |
1.50 |
Funding Details |
State | $27,434 |
Report Total: | $27,434 |
|
| |
Worksites
7200249
- Worksite Identifier: 7200249
- Start Date:
- End Date:
Area Description
San Luis Obispo Creek - pool development structures
Location Information
- Basin: Central California Coastal (180600)
- Subbasin:
- Watershed: Morro Creek-Frontal Pacific Ocean
- Subwatershed:
- State: California
- Recovery Domain: S. California - S. Central CA Coast
- Latitude: 35.317327
- Longitude: -120.620849
ESU
- South-Central California Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 27,434.00
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
N/A |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 13,717.04
- . . . . C.2.b.1
Length of stream made accessible 1.50
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 0
- . . . . C.2.d.1
Fishway chutes or pools installedY (Y/N)
- . . . . . . C.2.d.2
Number of fishway chutes/pools installed 0
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 13,717.04
- . . . . C.4.b
Total length of instream habitat treated .01
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .01
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 0
- . . . . . . C.4.d.7
Number of structures placed in channel 3
|
|