Gualala River Wood in the Stream Project Phase IV

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID705414
Recovery DomainsN Central California Coast
Start Date05/01/2004
End Date03/31/2007
Year2003
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


Introduced 91,528 board feet of unanchored large woody debris at 5 sites within the Gualala River watershed.

Project Benefit    


Increase in pool depth and instream cover, improve water quantity, water quality, riparian habitat, reduce sediment delivery, increase spawning and rearing habitat.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .29 .29

Funding Details

SourceFunds
State$23,782
Report Total:$23,782


Project Map



Worksites

7200485    


  • Worksite Identifier: 7200485
  • Start Date:
  • End Date:
Area Description
Fuller Creek - lwd placement (est.)

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Gualala River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 38.692508
  • Longitude: -123.330676

ESU

  • Central California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 4,756.00
    •      . . C.0.b Length of stream treated/protected .16
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Gualala Synthesis Report, 2003
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 4,756.40
      •      . . . . C.4.b Total length of instream habitat treated .16
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .16
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 0

7200487    


  • Worksite Identifier: 7200487
  • Start Date:
  • End Date:
Area Description
Robinson Creek - lwd placement (est.)

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Gualala River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 38.825022
  • Longitude: -123.490711

ESU

  • Central California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 4,756.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Gualala Synthesis Report, 2003
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 4,756.40
      •      . . . . C.4.b Total length of instream habitat treated .01
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .01
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 0

7200490    


  • Worksite Identifier: 7200490
  • Start Date:
  • End Date:
Area Description
Pepperwood Creek - lwd placement (est.)

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Gualala River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 38.621774
  • Longitude: -123.185757

ESU

  • Central California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 4,756.00
    •      . . C.0.b Length of stream treated/protected .03
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Gualala Synthesis Report, 2003
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 4,756.40
      •      . . . . C.4.b Total length of instream habitat treated .03
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .03
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 0

7200491    


  • Worksite Identifier: 7200491
  • Start Date:
  • End Date:
Area Description
Gualala River, N Fk - lwd placement (est.)

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Gualala River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 38.81957
  • Longitude: -123.471163

ESU

  • Central California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 4,756.00
    •      . . C.0.b Length of stream treated/protected .04
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Gualala Synthesis Report, 2003
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 4,756.40
      •      . . . . C.4.b Total length of instream habitat treated .04
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .04
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 0

7200484    


  • Worksite Identifier: 7200484
  • Start Date:
  • End Date:
Area Description
Gualala River, Little N Fk - lwd placement (est.)

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Gualala River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 38.815517
  • Longitude: -123.52782

ESU

  • Central California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 4,756.00
    •      . . C.0.b Length of stream treated/protected .05
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Gualala Synthesis Report, 2003
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 4,756.40
      •      . . . . C.4.b Total length of instream habitat treated .05
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .05
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 0