Fiscalini Bank Stabilization Project
Salmonid Habitat Restoration and Acquisition
|
705384 | S. California - S. Central CA Coast | 05/01/2004 | 06/22/2006 | 2003 | Completed | 01/26/2024 | |
| |
Description
Stabilized, reconstructed, re-vegetated, and improved salmonid habitat and passage along a 350-foot long, 30-foot high, non-vegetated creek bank that is actively eroding tons of prime agriculture land causing sedimentation of Santa Rosa Creek.
Project Benefit
Improve habitat by controlling stream bank erosion, establishing native riparian vegetation on the newly created creek bank, and reducing surface run-off and pesticide input into the creek by a buffer zone created along the length of the agricultural field at the top of the creek bank. These measures will ultimately yield long term benefits to steelhead by decreasing sediment input directly into the creek and establishing a vegetative canopy to help reduce stream water temperatures and increase food production at this site.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.07 |
.07 |
Riparian Habitat |
Stream Miles Treated |
.00 |
.00 |
Acres Treated |
1.5 |
1.5 |
Funding Details |
PCSRF | $119,305 |
Report Total: | $119,305 |
|
| |
Worksites
7201729
- Worksite Identifier: 7201729
- Start Date:
- End Date:
Area Description
Santa Rosa Creek - Fiscalini bank stabilization
Location Information
- Basin: Central California Coastal (180600)
- Subbasin:
- Watershed: Santa Rosa Creek-Frontal Pacific Ocean
- Subwatershed:
- State: California
- Recovery Domain: S. California - S. Central CA Coast
- Latitude: 35.569932
- Longitude: -121.061534
ESU
- South-Central California Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 119,305.00
- . . C.0.b
Length of stream treated/protected .07
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Section 4(a)(1) of the ESA |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 59,652.74
- . . . . C.4.b
Total length of instream habitat treated .07
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .07
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 0
- . . . . . . C.4.d.7
Number of structures placed in channel 2
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .07
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 59,652.74
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated 1.5
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Unknown |
- . . . . . . C.5.c.3
Acres planted in riparian .0
- . . . . C.5.d.1
FencingY (Y/N)
- . . . . . . C.5.d.2
Miles of fence along stream .07
|
|