Dairy Creek Upslope Erosion Control Project
Salmonid Habitat Restoration and Acquisition
|
705302 | S. California - S. Central CA Coast | 06/01/2004 | 03/15/2006 | 2002 | Completed | 01/26/2024 | |
| |
Description
Roads upgraded by outsloping w/rolling dips, culverts and wet armored crossing. Gullies stabilized and willow-brush check fences installed. Exposed slopes planted with native vegetation. 4000 feet of riparian cattle exclusion fencing installed.
Project Benefit
This project will prevent over 500 cubic yards of sediment from being delivered intoa steelhead stream.
Accomplishments
Upland Habitat |
Acres Treated |
10.0 |
10.0 |
Funding Details |
PCSRF | $48,259 |
Report Total: | $48,259 |
|
| |
Worksites
7201711
- Worksite Identifier: 7201711
- Start Date:
- End Date:
Area Description
Dairy Creek - upslope erosion control/riparian fencing
Location Information
- Basin: Central California Coastal (180600)
- Subbasin:
- Watershed: Morro Creek-Frontal Pacific Ocean
- Subwatershed:
- State: California
- Recovery Domain: S. California - S. Central CA Coast
- Latitude: 35.349981
- Longitude: -120.705772
ESU
- South-Central California Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 48,259.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Morro Bay Nation Estuary Program Management Plan |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 24,129.50
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated .0
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Unknown |
- . . . . . . C.5.c.3
Acres planted in riparian .0
- . . . . C.5.d.1
FencingY (Y/N)
- . . . . . . C.5.d.2
Miles of fence along stream 1.04
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 24,129.50
- . . . . C.6.b.1
Acres of upland habitat area treated 10.0
- . . . . C.6.b.2
Miles of road treated in upland area .23
- . . . . C.6.f.1
Planting for erosion and sediment controlY (Y/N)
- . . . . . . C.6.f.2
Species of plants planted for erosion and sediment control | |
Unknown |
|
|