El Capitan Canyon, In-Stream "Arizona-Crossing" Bridge Replacement Project

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Riparian Habitat
Project ID705106
Recovery DomainsS. California - S. Central CA Coast
Start Date05/01/2004
End Date03/20/2006
Year2002
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


Concrete Arizona in-stream crossing was removed and replaced with above-stream bridge. Non-native vegetation was removed and native species were planted on banks, opening 4 mi of stream for salmonids.

Project Benefit    


Open 4.12 miles of stream for salmonids.

Accomplishments

Metric Completed Originally
Proposed
Riparian Habitat
  Stream Miles Treated .01 .01
  Acres Treated .0 .0
Fish Passage
  Barriers Removed
  Miles Opened 4.12 4.12

Funding Details

SourceFunds
PCSRF$370,700
Report Total:$370,700


Project Map



Worksites

7200463    


  • Worksite Identifier: 7200463
  • Start Date:
  • End Date:
Area Description
El Capitan Creek - fish passage improvement

Location Information

  • Basin: Central California Coastal (180600)
  • Subbasin:
  • Watershed: Jalama Creek-Frontal Santa Barbara Channel
  • Subwatershed:
  • State: California
  • Recovery Domain: S. California - S. Central CA Coast
  • Latitude: 34.464576
  • Longitude: -120.023106

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 370,700.00
    •      . . C.0.b Length of stream treated/protected .02
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Steelhead Assessment and Recovery Opportunities in Southern Santa Barbara County, CA. Stoecker and Conception Coast 2002
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 185,350.00
      •      . . . . C.2.b.1 Length of stream made accessible 4.12
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade 4.12
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 185,350.00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .01
        •      . . . . C.5.b.2 Total Riparian Acres Treated .0
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            native riparian vegetation
          •      . . . . . . C.5.c.3 Acres planted in riparian .0
        •      . . . . C.5.h.1 Riparian plant removal/controlY (Y/N)
          •      . . . . . . C.5.h.2
            Species of plants treated/removed in riparian
            exotic species
          •      . . . . . . C.5.h.3 Acres of riparian treated for plant removal/control .0