Jordon Creek Barrier Modification Project
Salmonid Habitat Restoration and Acquisition
|
704359 | N CA - S Oregon | 06/01/2001 | 04/15/2003 | 2000 | Completed | 01/27/2024 | |
| |
Description
Culvert replaced with bridge. Bridge changed from railroad car to new engineered steel bridge (50x14) set for 100-yr flow events. Grantee received funding from NFWF to compensate for the additional cost.
Project Benefit
Improve: Water quality (including temperature), Riparian dysfunction, Fish passage
Funding Details |
State | $44,282 |
Report Total: | $44,282 |
|
| |
Worksites
7004178
- Worksite Identifier: 7004178
- Start Date:
- End Date:
Area Description
Jordan Creek - barrier modification/riparian plantings
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin: Smith River
- Watershed: Point St George-Frontal Pacific Ocean
- Subwatershed:
- State: California
- Recovery Domain: N CA - S Oregon
- Latitude: 41.789521
- Longitude: -124.148805
ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 44,282.00
- . . C.0.b
Length of stream treated/protected .05
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
N/A |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 22,141.00
- . . . . C.2.b.1
Length of stream made accessible .00
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 0
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade .00
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded 1
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade .00
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 22,141.00
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .00
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 1
- . . . . . . C.4.d.7
Number of structures placed in channel 1
|
|