Jordon Creek Barrier Modification Project

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat
Project ID704359
Recovery DomainsN CA - S Oregon
Start Date06/01/2001
End Date04/15/2003
Year2000
StatusCompleted
Last Edited01/27/2024
 
1 - 1

Description    


Culvert replaced with bridge. Bridge changed from railroad car to new engineered steel bridge (50x14) set for 100-yr flow events. Grantee received funding from NFWF to compensate for the additional cost.

Project Benefit    


Improve: Water quality (including temperature), Riparian dysfunction, Fish passage

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
State$44,282
Report Total:$44,282


Project Map



Worksites

7004178    


  • Worksite Identifier: 7004178
  • Start Date:
  • End Date:
Area Description
Jordan Creek - barrier modification/riparian plantings

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin: Smith River
  • Watershed: Point St George-Frontal Pacific Ocean
  • Subwatershed:
  • State: California
  • Recovery Domain: N CA - S Oregon
  • Latitude: 41.789521
  • Longitude: -124.148805

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 44,282.00
    •      . . C.0.b Length of stream treated/protected .05
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      N/A
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 22,141.00
      •      . . . . C.2.b.1 Length of stream made accessible .00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 0
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade .00
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade .00
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 22,141.00
        •      . . . . C.4.b Total length of instream habitat treated .00
        •      . . . . C.4.d.1 Channel structure placementY (Y/N)
          •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
          •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .00
          •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 1
          •      . . . . . . C.4.d.7 Number of structures placed in channel 1