Skyline Pipe Arch and Sediment Reduction Project

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat
Project ID704275
Recovery DomainsN Central California Coast
Start Date06/01/2001
End Date03/31/2003
Year2000
StatusCompleted
Last Edited01/27/2024
 
1 - 1

Description    


Eliminated one barrier to open up 1/2 mile of salmonid habitat. Reduced sediment by grade control structures, eliminated inboard ditch, stabilized bank and fill slope, removed sediment slug and upgraded undersized culvert.

Project Benefit    


Improve: Water quality (including temperature), Excessive sediment, Fish passage

Accomplishments

Metric Completed Originally
Proposed
Fish Passage
  Barriers Removed
  Miles Opened 1.30 1.30

Funding Details

SourceFunds
PCSRF$22,637
Report Total:$22,637


Project Map



Worksites

7004105    


  • Worksite Identifier: 7004105
  • Start Date:
  • End Date:
Area Description
Seely Creek - Sites 1-2 (culvert barrier removal/bank stabilization)

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Lower South Fork Eel River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.151316
  • Longitude: -123.865843

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 5,659.00
    •      . . C.0.b Length of stream treated/protected 2.60
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      N/A
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 2,829.58
      •      . . . . C.2.b.1 Length of stream made accessible 1.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade 1.00
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 2,829.58
        •      . . . . C.4.b Total length of instream habitat treated .00
        •      . . . . C.4.d.1 Channel structure placementY (Y/N)
          •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
          •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .00
          •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
          •      . . . . . . C.4.d.7 Number of structures placed in channel 2

7004107    


  • Worksite Identifier: 7004107
  • Start Date:
  • End Date:
Area Description
Seely Creek - Site 3 (culvert installation)

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Lower South Fork Eel River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.151423
  • Longitude: -123.864946

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 5,659.00
    •      . . C.0.b Length of stream treated/protected .10
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      N/A
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 2,829.58
      •      . . . . C.2.b.1 Length of stream made accessible .10
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade .10
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 2,829.58
        •      . . . . C.4.b Total length of instream habitat treated .00
        •      . . . . C.4.d.1 Channel structure placementY (Y/N)
          •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
          •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .00
          •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
          •      . . . . . . C.4.d.7 Number of structures placed in channel 0

7004108    


  • Worksite Identifier: 7004108
  • Start Date:
  • End Date:
Area Description
Seely Creek - Site 4 (culvert upgrade)

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Lower South Fork Eel River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.147155
  • Longitude: -123.863948

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 5,659.00
    •      . . C.0.b Length of stream treated/protected .10
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      N/A
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 2,829.58
      •      . . . . C.2.b.1 Length of stream made accessible .10
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade .10
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 2,829.58
        •      . . . . C.4.b Total length of instream habitat treated .00
        •      . . . . C.4.d.1 Channel structure placementY (Y/N)
          •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
          •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .00
          •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
          •      . . . . . . C.4.d.7 Number of structures placed in channel 0

7004109    


  • Worksite Identifier: 7004109
  • Start Date:
  • End Date:
Area Description
Seely Creek - Site 5 (erosion control)

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed: Lower South Fork Eel River
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.147326
  • Longitude: -123.865025

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 5,659.00
    •      . . C.0.b Length of stream treated/protected .10
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      N/A
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 2,829.58
      •      . . . . C.2.b.1 Length of stream made accessible .10
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade .10
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 2,829.58
        •      . . . . C.4.b Total length of instream habitat treated .00
        •      . . . . C.4.d.1 Channel structure placementY (Y/N)
          •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
          •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .00
          •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
          •      . . . . . . C.4.d.7 Number of structures placed in channel 0